My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV14485
DRMS
>
Back File Migration
>
Revision
>
REV14485
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:25:41 AM
Creation date
11/21/2007 10:53:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Revision
Doc Date
11/22/2002
Doc Name
Results of Adequacy Review (bond estimate)
From
TAK
To
File
Type & Sequence
MR181
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : XXX <br />Date : 11/22/2002 <br />User : TAK <br />Agency or organization name :DMG <br />Permit or other job action : MR-181 Expansion of Low-quality Coal Stockpile <br />Task description :Push low quality coal into pit <br />HOURLY EQUIPMENT COST <br />State :Colorado <br />County : Routt <br />Site : Foidel Creek Mine <br />Basic machine : Cat OIOR - IOSU Horsepower : 570 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br />Attachment no. 2 : NA <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $60.81 NA <br /> OperatingcosUhour : $112.14 100 <br /> Ripper op. cosUhour : $0.00 NA <br /> Operator cosVhour : $30.65 NA <br /> Total unit cosUhour : $203.60 Total fleet wst/hour : $814.42 <br /> <br />MATERIAL QUANTITIES ;. _,. <br />Initial Swell Loose <br />volume: 50,000 LCY factor : NA volume: 50,000 LCY <br /> <br />Source of estimated volume :Cover letter of MR-181 submittal <br />Source of estimated swell factor :NA <br />;; <br />HOURLY PRODUCTION <br />Job Condition Correction Factors <br />Source <br /> Operetor skill : 0.75 (avg.) <br />Average push distance : 500 feet Material consistency : 1.20 (Cat HB) <br />Unadjusted hourly production : 410.8 LCY/hr Dozing method : 1.10 (50% sQ <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (fshi(f/day) <br />Loose stockpile Spoil pile : 0.80 (fnd-rQ <br /> Push gradient : 1.11 (Cat HB) <br />Average push gradient : 5.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,900 feet Material weight : 1.44 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 1,600 Ibs/LCY Net correction : 1.05 <br />Weight description <br />Coal -Bituminous, Raw <br />JOB TIME AND COST <br />Fleet size : 4 Dozers) <br />Unit cost : $0.470 /LCY <br />Adjusted unit production : 432.83 LCY/hr <br />Adjusted fleet production : 1,731.32 LCY/hr <br />Total job time : 28.88 Hours <br />Total job cost : $23,520 <br />Permiujob# : C-82-056 <br />Abbreviation :none <br />Filename : C056-xxx <br />
The URL can be used to link to this page
Your browser does not support the video tag.