My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE25002
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE25002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:33:33 PM
Creation date
11/21/2007 10:52:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Enforcement
Doc Date
6/15/1993
Doc Name
PN C-81-019 COLOWYO COAL CO NOVS C-93-072 C-93-073 C-93-077 PR01 DEMONSTRATIONS OF PROPPECT POND
From
DMG
To
JANET BINNS LARRY ROUTTEN STEVE RENNER
Violation No.
CV1993072
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />___ ~TATF QF <br />DIVISION OF A1IN ERALS AND GEOLOGY <br />Depanmem ro Natural Resources <br />111 7 $hrnnJn SL, Roum _`15 <br />Drm er. CO tlU_'U3 <br />Phone: i10}I tlon-}567 <br />Fg1.~!0;•~9: _'!1106 <br />December 1, 1992 <br />Juan Garcia <br />Hydrologist/Environmental Engineer <br />Colowyo Coal Company <br />5731 State Highway 13 <br />Meeker, CO 81641 <br />RE: Colowyo Mine, Permit C-81-019 <br />MR-22; Hydrology and Other Concerns <br />Dear Mr. Garcia, <br />II ~ iii h I I <br />JF ?(Qal <br />4~' <br />~~„ msg. <br />~~ ,~, <br />\`~`~; <br />\'q`l,. <br />` v Anmrr <br />f.~ oxrnw <br />virharlB lunG <br />Dn iGon Ovrcmr <br />riR-22: Extension of Deadline For Reaching Aoreement on Prospect Pond <br />Hvdrologic Hodeling <br />In order to speed up approval of permit revision PR-Ol and issuance of renewal <br />RN-02, the Division agreed in June of 1992 to postpone final approval of hydrologic <br />modeling for the Section 16 and West Pit areas of the mine. It was agreed at that <br />time that the Division and Colowyo would reach agreement over modeling for the <br />Prospect Pond and Section 16 area of the mine on or before August 31, 1992. It was <br />also agreed that colowyo could not begin disturbance in the west Pit area of the <br />mine until the Division had approved the hydrology for that area. With these <br />agreements in place, Colowyo was permitted to begin construction of the Prospect <br />Pond and disturbance of a portion of the Section 16 area of the mine. <br />Soon after approval of PR-O1, the Division met with Colowyo to discuss their <br />upcoming submission concerning the Prospect Pond. Since that time the Division has <br />made repeated inquiries to Colowyo as to when their latest submission would be <br />received by the Division. Colowyo requested extension of the Prospect Pond <br />deadline until October 30, 1992 on September 1, 1992. As part of minor revision <br />HR-22, Colowyo has formally requested that the deadline for reaching agreement be <br />revised to December 31, 1992. <br />The Division will agree to an extension of the deadline for agreement between <br />Colowyo and the Division over hydrologic modeling of the Prospect Pond if Colowyo <br />will revise page 4.05-2a of its permit to agree to submission of its hydrology <br />model for Prospect Pond by December 11, 1992. This will allow time for the <br />Division to cc^Tent and reach agreement with Colowyo by December 31, 1992. The <br />Division does not expect to extend the deadline again. <br />As Builts for Prospect Pond and Prospect Ditch <br />The Division has requested as builts for the Prospect Ditch and the Prospect Pond <br />on several occasions. The Division has not yet received these documents. Please <br />submit these documents to the Division, along with the page change requested above, <br />by December 11, 1992 in order to remain in compliance with Rule 2.05.3(4). <br />
The URL can be used to link to this page
Your browser does not support the video tag.