My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE24963
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE24963
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:33:31 PM
Creation date
11/21/2007 10:51:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
Enforcement
Doc Date
8/4/1993
Doc Name
BEAR COAL CO INC NOV C-93-056 04/1993 SLIDE PN C-81-033
From
J E STOVER & ASSOCIATES
To
DMG
Violation No.
CV1993056
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J. E. STOVER & ASSOCIATES III'll'll'll"II'll <br />2768 COMPASS DRIVE, SUITE 101 999 <br />GRAND JUNCTION, COLORADO 81506 <br />PHONE: (303) 245-4101, FAS 242-7908 <br />MINE ENGINEERING CIVIL ENGINEERING <br />MINE RECLAMATION CONSTRUCTION NANACEMENT <br />August 2, 1993 ,~E: <br />=~EII~F~, <br />A~~ 41993 <br />1313sShermanMSteraRoomn215eology Div~so'~a/•by„1~,~~s~~ <br />Denver, CO 80203 oOJOyY <br />Re: Bear Coal Company, Inc. _ ___ <br />NOV C-93-056, April 1993 Slide <br />Permit C-81-033 <br />Dear Mr. Shuey: <br />One of the abatement steps for the referenced NOV required the <br />submittal of a slide "cause and repair plan" by May 31, 1993. The <br />cause and repair plan was submitted as required. The other <br />abatement step was to effect on the ground repairs by July 15, <br />1993. The NOV was issued on April 16th, therefore the time allowed <br />for abatement was 90 days. <br />On July 13, 1993, the Division extended the time for abatement to <br />August 13, 1993. As you know, Bear and the Division are still <br />working out a mutually acceptable repair plan for the slide. <br />Rule 5.03.2(2)(c)(i) provides for the extension of the abatement <br />period where the permittee has timely applied for and diligently <br />pursued approval of designs but the approval will not be issued <br />within 90 days. Please extend the abatement deadline for the <br />referenced NOV to October 8, 1993 to allow time for Bear and the <br />Division to agree upon a repair plan and to allow time for the <br />implementation of the plan. The extended abatement period will <br />increase the total time for abatement to 175 days. <br />Please call if you have any questions. <br />Sincerely, <br />Jim Stover, P.E. <br />Consulting Engineer <br />cc: W. A. Bear, Jr. <br />
The URL can be used to link to this page
Your browser does not support the video tag.