Laserfiche WebLink
Exhibit F <br />List of Other Permits and Licenses Required <br />Water Quality <br />• A Stormwater Permit (and Stormwater Management Plan) has been obtained <br />• A discharge permit is not expected to be required because no point source <br />discharge is planned. <br />Water Quantity <br />• No water rights are expected to be required. <br />Air Quality <br />• One or more fugitive dust permits may be required. <br />Local Government <br />• RILC has discussed this operation with Summit County and will comply with all <br />applicable zoning regulations. <br />Wetlands <br />• A Corps of Engineers 404 Permit is not expected to be required. <br />10 <br />