My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-06-27_REVISION - M1998052
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1998052
>
2003-06-27_REVISION - M1998052
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:45:15 PM
Creation date
11/21/2007 10:51:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998052
IBM Index Class Name
Revision
Doc Date
6/27/2003
Doc Name
Permit Application
From
Rock Island Land Co. LLC
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
eXhinit c <br />Mining Plan <br />Access <br />The access road from Tiger Road to the original permit area has now been <br />converted to a driveway providing access to the two log cabins constructed south of <br />the permit area. Access to the Amendment Area will follow that drive for a short <br />distance (as in the original permit) then become part of the requested Amended <br />Permit Area as shown on Exhibit E. <br />Thickness of the Deposit <br />The dredge tailing piles very in height from 10 to 20 feet (or more) above the <br />water table throughout the permit area. <br />Mining Plan <br />The mining plan is simply to remove the dredge tailing from the surface of the <br />ground. Mining will not extend to the water table. Mining will be limited to within 2 <br />feet of the water table. No activities will take place in the aver or adjacent wetlands. <br />Facilities <br />Equipment stored at the site will be trucks, loaders, screening plant and other <br />associated tools required for harvesting the tailing. Stockpiling of various materials <br />has been done, is being done, and will also be necessary in the future. <br />Screening <br />At this time, the only activities will be the removal of the raw dredge material <br />and the sorting as to size of some of the material by screening. Crushing is not <br />anticipated at this time. If crushing becomes necessary or desirable, all necessary air <br />quality and local government (Conditional Use) permits will be obtained. <br />Schedule <br />Mining will continue immediately upon the issuance of this amendment. <br />Demand will dictate how fast mining progresses and mining will progress as fast as <br />necessary to satisfy demand for the product. The I'rfe of the mine is estimated to be <br />three years. <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.