Laserfiche WebLink
<br />HOURLY PRODUCTION <br />ll <br />C <br />tt <br />H sheet 2 of 2 <br />dU <br />nq <br />apdC <br />V <br />Scraper Payload (we+ghll Bass <br />Scraper Bowl (volume) Bass <br />Matenal we+ght 2.550 poundslLCY Struck volume 2t DO LCY <br />Matenal deacriptwn Heaped volume 31 00 LCY <br />Earth -Dry packed Average volume 26.00 LCY <br />Rated payload . 75.000 pounds Adjusted wpaGty 26.00 LCY "' <br />Payload eapdGry ~ 29 a7 LCY ••• no.n:y p~rnr_trn +c^r-fs r,u,mc par :caper war on pun p„a m ooch <br /> <br />~cle Tlma : Job Cortdldon Corrections : Sde atldude (fl.) 7.050 <br /> Suaper Push dozer Source <br />Suaper loading lime' . 7.00 minutes Alt+tude atl) t 000 NA (Cat H8) <br />Maneuver and spread time 0.60 minutes Job etfic+ency 0 830 NA (Cat H8) <br />• aaa Dina Der wapr war m ouN~ou~+ maoen <br />im <br />Tr Net COrredtOn 0 830 NA <br />~_v <br />Road Conditbn desurpt+on Rrm, smooth, roDury, chrVPf surlared, watered, rnautramed <br /> minutes <br />Ratum route <br />i J.500 -8.00 3.00 -5.00 2972 1.56 <br />- ~_ l <br /> <br /> <br /> <br />vsvM uma kr aacn srprttant a aaweea tp at:oWretwnraecererauon Return Ume 1.56 mutates <br />tads vebrpaes ero mu at4nattle per tool resistance mown, na averope <br />Total Suaper team rycle time (load * haul • maneuver and spread + retain) 8.91 minutes <br />Unadjusted unit producbordhour 350 34 LCYRtour "' Adjusted for )ob conditions 290 78 LCYRtour <br />Optimal number of scrapers per push dozer NA Selected number of suapers 2 scraper(s) <br />Adjusted single scraper team (unit) hourly produdton 290 78 ACV/hour <br />Adjusted multiple saaper team Itleeq hourly production 290.78 LGYlhour <br /> <br />JOB 71ME ANO COST <br />Fieetsize 1 Teams) Total job time: x.30 Hours <br />Unit cost 52.337 ILCY Total job cost $2,922 <br />