Laserfiche WebLink
• III III III III IIII III • <br />STATE OF COLORADO <br />MINED LAND RECLAMATION DIVISION of ~o <br />Department of Natural Resources Nr`gr$ <br />1313 Sherman St., Room 215 , 7 ~ Fa <br />Denver, CO 60203 . ~~. <br />303 866-3567 ' /876' <br />FA x. 303 832-8106 <br />Roy Ramer. <br />Governor <br />Miohael B. Long, <br />Division Drtector <br />DATE: April 14, 1992 <br />T0: Larry Oehler <br />FROM: Allen Sorenson <br />RE: San Luis Project Tailings Impoundment and Collection Pond <br />The main features of the tailings disposal area consist of a continupus <br />composite liner system consisting of compacted, low permeability soil and a <br />geosynthetic membrane overlaid with an under-drain system, two major~earthern <br />embankments, a seepage collection pond, a tailings delivery pipeline, a runoff <br />diversion channel, and a water return pump back system. <br />IMPOUNDMENT EXCAVATIONS <br />The majority of the tailings impoundment was established in cut. Onlly several <br />localized arroyos were filled to establish the final grade within th <br />impoundment. As a result differential settling of the foundation up~n loading <br />will be minimized. If differential ,settling does occur, the 40 mil ~LDPE <br />geomembrane is specified to with stand a 9007. change in elongation. <br />During excavation of the drain blanket channel through the splitter embankment <br />foundation, a perched aquifer was encountered. As a result, the des'gn was <br />modified to raise the channel by 13 feet to be above this saturated one. The <br />operator performed density tests on the saturated materials and stat~s that <br />they are well consolidated, however no numerical values for the material <br />densities are given. A three-foot deep layer of gravel was installep on the <br />invert of the channel excavation to allow ground water to travel uni peded <br />under the foundation. <br />During excavation of the upper impoundment, several localized zones ~f sandy <br />clay were encountered in the impoundment floor. The materials in th se zones <br />were saturated, the zones of saturated materials are described as be ng <br />"relatively small and localized." These saturated materials, when <br />encountered, were over-excavated and backfilled with clean sands and gravels. <br />Also encountered during excavation of the upper impoundment, was a <br />condemnation drilling hole. Once the excavation was at depth, the skeel <br />casing was cut off, and an underdrain trench was constructed from th~ casing <br />to the splitter embankment underdrain mentioned above. During the final <br />grading operations the drill casing was regrouted and sealed. <br />