My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE24892
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE24892
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:33:29 PM
Creation date
11/21/2007 10:50:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984062
IBM Index Class Name
Enforcement
Doc Date
6/6/1981
Doc Name
ENERGY 3 MINE APPLICATION FN C-36-81
From
MLR
To
ENERGY FUELS CORP
Violation No.
TD1990020244004TV2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'~- MAR 22 '90 12 59 CYPRUS YRMPR VRLLEY <br />Rule 2.05.3 (8) -Continued <br />- P.16i11 <br />Energy Fuels has not constructed and does not plan to construct any <br />coal processing waste or non-coal processing vaste banks, dams or <br />embankments nor any other type of processing waste storage facili- <br />ties. All coal is simply crushed at the tipple and loaded onto <br />trains with no other processing occurring. For this reason Rule <br />2.05.3 (B) does not apply to this application. <br />(9) Underground development vaste <br /> <br />A narrative and appropriate maps and cross-sections prepared to <br />meet the standards of 2.10, describing the proposed disposal methods and <br />sites for placing underground development vaste and excess spoil gene- <br />rated at surface areas disturbed by surface operations and facilities, <br />according to 4,09. Each plan shall describe the geotechnical investiga- <br />tion design, construction, opetatien, maintenance, and removal, if <br />appropriate, of the structurC and be prepared in accordance with 2.05.3 <br />{6)(h), (c) and (d). <br />Except for the excess spoil already in the permanent overburden <br />stockpile is Section 24, there will be no additional excess spoil <br />and therefore no new designated disposal area will be necessary. <br />Some underground development waste will occur as a result of one to <br />two feet of roof of the underground mine being removed to enhance <br />stability. Aowever, this rock will be disposed of in the mined out <br />pit at the surface mine to achieve the approximar,P, nriginal con- <br />tour. This mined out pit is referred to as the "Water Retention <br />sad Roof Rock Disposal Pit" on :Sap 6, Energy 'fine No. 3 Mine Plan. <br />CE ~~~~ ~~n~g~ <br />3.05 - 32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.