My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE24892
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE24892
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:33:29 PM
Creation date
11/21/2007 10:50:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984062
IBM Index Class Name
Enforcement
Doc Date
6/6/1981
Doc Name
ENERGY 3 MINE APPLICATION FN C-36-81
From
MLR
To
ENERGY FUELS CORP
Violation No.
TD1990020244004TV2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~• <br />STATE OF COLORA 00 RIC WARD D. lAW.1, Dove MO. <br />DEPART0.IENT OF NATURAL RCSOUgCES <br />D. MOlli~ hrnr, fltfnlli~M f11/Pflnr <br /> <br />III IIIIIIIII IIII III <br />999 <br />i1'IINED LAND RRfT.A~ViATif1N <br />423 Centennial Building,13135~erman Street <br />Denver, I:oioratlo 80203 Tei. (303) 833587 <br />David C. Shelton <br />Director <br />June 30, 1981 <br />Mr. Gary w. Myers <br />Energy Fuels Corporation <br />P.O, Sox 772129 <br />Steamboat Springs, Colorado 80477 <br />Re: Energy No. 3 Mine Application <br />our Pile No. C-036-8I <br />Dear Gary: <br />JUL 81981 ~ c <br />This letter is to inform you that the adequacy review of the above application <br />is complete and that the Division is proceeding on our technical review. <br />To date you should have received three adequacy letters dated June ?, 9, <br />and 16. <br />Enclosed you will find a memo from Jim Pendleton of our staff, who did the <br />technical zeview on Hackfilling and Grading, Waste Material and Spoil, and <br />Subsidence. <br />The Division has also completed a technical review of Topsoil, Topsoil <br />Handling, and Prime Farmlands. With the exception of the one problem noted <br />in our June 2 adequacy letter, the Division has not identified any additional <br />concerns with these sections. <br />The Division is also proceeding with a technical review of the Sediment <br />Control System and Operations plan. When these reviews are ebmpleted in <br />the next few weeks, we will forward our coa7rlentsY(if any) imalediately. <br />If you have any questions concerning this matter, please contact me. <br />Sincer y, - " ~ <br />.. is <br />Robert Li.ddle <br />Reclamation Specialist <br />RL/nit <br />En CI OSUre <br />~~ <br />f._.. ...._. .. .... -_ ~.~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.