My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV14273
DRMS
>
Back File Migration
>
Revision
>
REV14273
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:25:27 AM
Creation date
11/21/2007 10:50:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987127
IBM Index Class Name
Revision
Doc Date
11/17/1998
Doc Name
FINANCIAL WARRANTY INCREASE BUTALA PIT M-87-127
From
DMG
To
BUTALA CONSTRUCTION
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~] <br />ROADAHLE EQUIPMENT; <br />' -~~ ~~~~ Total Eqp. Fleet Size Haul Trip <br />Machine Descr ip[ion Cost/hr (no. hauled) Cos[Ihr <br />Subtotals : z $OL00 <br />MOB/DEMOB SUPPORT EQUIPMENT: "'""-"-" <br />~" ~ ~~~~~~-~-~--"" "-"-" Weight Ownership Haul Rig F1eeC Size Haul Trip <br />Non-Roadable Eqp. Description (Cons) Costlhr Cosc/hr (no, hauled) Cost/hr <br />Subtotals : 50,00 <br />Total Eqp, Fleee Size Haul Trip <br />Roadable Ec]p. Description Cost )hr (no. hauled) Costlhr <br />Subtotals _ _ $0?00 <br />sheet 2 of 2 <br />Return Trip <br />Cost/hr <br />50.00 <br />Return Trip DOT Pe emit <br />Cost/hr Cost/ea <br />$0.00 50.00 <br />Return Trip <br />Cost/hr <br />$0.00 <br />EQUIPMENT HAUL DISTANCE 6 TIME <br />Nearest major city or [own within project area region: Salida <br />Total one way travel distance = 25 .0 miles . Average travel speed 40.00 mph. <br />Job Time - Non Roadable Equip.= 0. 50 hours load Roadable Equip.= N/A hours load <br /> 0. 63 hours haul 0.63 hours haul <br /> 0. 50 hours unload N/A hours unload <br /> 0. 63 hours return 0.63 hours return <br />JOB COST <br />Total Mob/Demob Cost = $583.51 <br />NOTE: Non-roadable equipment (haul rig required to transport) mob/demob costs based on 2 round trips, each trip <br />consisting of a one-way loaded haul and a one-way empty return. Roadable equipment {no haul rig required) <br />costs based on one round trip. Colorado DOT requires special permits for oversize equipment on certain <br />specified road segments within the Stale. Bepara [e pecmics are xegu fired for each cig on each loaded trip. <br />Additionally, pilot cars (one or two per rig depending on degree of oversize) are also required for oversize <br />equipment hauling, and loading/unloading times must be increased substantially for equipment which must be <br />partially dismantled for transport antl re-assembled at [he lob site. Costs for lifting equipment and ocher <br />suppor< equipment needetl for [his work should be included in the mob/demob costs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.