My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV14272
DRMS
>
Back File Migration
>
Revision
>
REV14272
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:25:27 AM
Creation date
11/21/2007 10:50:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1976020
IBM Index Class Name
Revision
Doc Date
12/21/1981
From
MLR
To
ANIMAS AGGREGATES INC
Type & Sequence
HR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III III III III IIII III ! • STATE OF COLORADO RiC HnRD D.~. Govc mor <br />DEPAflTMENT OF NATURAL flESOURCES <br />999 D. Monte Pascoe, Executive Director <br />MINED LAND RECLAMATION <br />- ~r(~ 423 Centennial Building, t313 Sherman Street <br />"1°"'/ Denver, Colorado 80203 Tel. (303) 839-3567 <br />David C. Shelton <br />Director <br />December 21, 1981 <br />Animas Aggregates, Inc. <br />Thomas Pit <br />File No. 76-20 <br />October 1981, Amendment Bond Calculation ~~ <br />Reclamation Specialist, Peter H. Evans '~' ~ <br />To calculate an approximate reclamation cost for the 4.4 acre stockpile <br />area added by amendment: <br />1. For ease of calculation, consider a rectangle 450' x 424' <br />2. The area can be cleared of stockpiled materials at no cost <br />3. The area will first need to be ripped to relieve compaction: <br />a D-9 can puZZ a single ripping tooth penetrating Z2" at approximately <br />1 mph.; we will consider using a D6 pulling 3 teeth penetrating 8" <br />on 24" centers <br />71 passes x 450' long x half as fast x % min turnaround <br />450' <br />71 x (44fpm + •25 min) = 12.4 hrs. <br />figure 2 full days to cover slack time and transportaion @ $800 per day <br />plus $15/hr for an operator - $1840.00 <br />4. Assuming the topsoil can be replaced at a cost of $80/lcg, <br />5.80 x (6" x 4.4 Rc) - $2840 <br />5. Seedbed preparation would require a tractor for about 4 hours @ S12/hr <br />plus $10/hr for an operator - $88 <br />6. Using the operator's estimate for fertilization, mulching and seeding <br />of $600 <br />7. The total adds up to $5400 <br />/mab <br />
The URL can be used to link to this page
Your browser does not support the video tag.