My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE24871
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE24871
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:33:29 PM
Creation date
11/21/2007 10:50:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Enforcement
Doc Date
12/13/2004
Doc Name
Request for Lease Modifications for Federal Coal Lease D-034365
From
Colowyo Coal Company L.P.
To
BLM
Violation No.
CV2004001
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Coal Tonna¢e Calculation <br />The coal tonnage was based off our most recent model information which includes the drill hole data noted on Drawing No. 1. The <br />bum azeas in these ridges are very unpredictable and cannot be clearly delineated without intensive drilling. For example please see <br />Drill Hole WP-O1-02 on the Drawing No. 1. Colowyo has taken their proposed extraction to the approximate center of the ridge <br />line. The seams tazgeted for this lease modification are the "C" and "D" Seams only. <br />Coal Eatractiou MethodoloEies <br />With Colowyo's recent success with Highwall Mining, Colowyo is pursuing Highwall Mining targets in the adjacent azeas of the <br />existing pits. This lease modification is one of those azeas. Coal extraction would be a two phase operation for both seams. A <br />mining bench will be established by pre-stripping with the Truck\Shovel operation. This will occur along the east side of the new <br />lease area. Following the pre-strip, the coal exposed will be removed by traditional surface mining techniques. The remaining <br />portion of each seam is then planned to be recovered by Highwall Mining method. It should be noted that Colowyo's ability to <br />extract this coal will be based on geotechnical conditions that have yet to be determined. The Highwall miner is capable of <br />extracting coal from the horizontal depths proposed in the lease modification (less than 400 feet). The Highwall miner has <br />sufficient technology to control and manage the extraction height and depth, including the depth in the portal to within inches. The <br />extraction of this coal will be planned in our mining sequence with the remainder of the West and East pits. <br />
The URL can be used to link to this page
Your browser does not support the video tag.