My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV14208
DRMS
>
Back File Migration
>
Revision
>
REV14208
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:25:23 AM
Creation date
11/21/2007 10:49:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977344
IBM Index Class Name
Revision
Doc Date
1/27/1999
Doc Name
HYDROGEOLOGIC ASSESSMENT - HOLNAM INC PORTLAND COLO
Type & Sequence
TR6
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />' <br /> RGI ~ 04548198 <br /> Hotnam, Inc. <br /> January 27,1999 <br />' Page 8 <br />' 3.5 Old Monitoriag Well Evaluation <br /> <br /> <br /> <br /> <br /> <br />CJ <br /> <br /> <br /> <br />1 <br />t <br />1 <br /> <br /> <br /> <br />As previously discussed, four (4) Bound water monitoring wells were installed in the bottom of Cut 6 in <br />1991. As this cut was filled with CKD/sludge and mining wasteJoverburden the well casings were <br />extended to maintain access from the surface. As part of this investigation RGI evaluated the utility of <br />these monitoring wells as sources of additional data This evaluation was conducted during the measuring <br />of water levels, and during well development and sampling. The measurement of water levels resulted in <br />varying water level elevations between the wells that did not reflect a consistent gradient across the area. <br />During subsequent well development activities an attempt was made to lower athree-inch diameter bailer <br />down each of the four (4) wells to clean and redevelop each of the wells. In each of the wells the bailer <br />could not be lowered beyond a few tens of feet due to the misalignment of the well casing resulting from <br />the numerous casing extensions added to the original wells as Cut 6 was bacld'illed. Finally, a Bound <br />water sampling pump was lowered down one (1) of the wells in an attempt to collect a Bound water <br />sample for analysis. However, when the pump was started the intake became clogged with rust and other <br />debris in the well. Based on the results of these activities it appeazs that these wells are not suitable for <br />cotlecting reliable ground water quality and elevation data and should be abandoned in accordance with <br />State regulations. <br />3.6 CKD/Sludge Sampling <br />CICD/sludge samples were collected for leach testing on September 11, 1998 and submitted to the <br />laboratory along with the ground water samples discussed below. The purpose of the leach testing was <br />to evaluate what constituents of the CKDfsludge mixture could potentially be leached out either by ground <br />water flowing through the material or rainfall infiltrating through the materia! to the ground water. <br />Samples were collected using glassjars to collect material recently (i.e., within less than two hours) placed <br />in the landfill area. In collecting the samples care was taken to get a representative sample of both the <br />CKD and the sewage sludge in the approximate proportions in which they are placed in the landfill. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.