My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV14170
DRMS
>
Back File Migration
>
Revision
>
REV14170
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:25:21 AM
Creation date
11/21/2007 10:49:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983090
IBM Index Class Name
Revision
Doc Date
1/6/2000
Doc Name
FAX COVER
From
TUTTLE APPLEGATE INC
To
ERICA CROSBY
Type & Sequence
TR2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sent By: TUTTLE APPLEGATE INC U; 30345227593034526611;Jan-6-00 17:57; Page 2{2 <br /> <br />January 5, zooo ~~P~2gate,MC. <br />Consuttents for Lend, Mineral and Water <br />Ms. Erica Crosby <br />Division of Minerals and Geology <br />1313 Sherman St., Room 215 <br />Denver, Culurado 80203 <br />RE: Adequacy letter dated December 16, 1999 regarding Technical Revision 002 to Hall <br />Irwin Construction Company Permit No. M-83-090 <br />Dear Ms. Crosby: <br />Following a discussion with Je[T Gregg of Hall Irwin, here are responses to your individual <br />comments from December 16. <br />1. The reclaimed ponds should be labeled from west to east on the north side of the river, 1, S, <br />and 4, and nn the south side of the river from west to east, 2 and 3, It is my understanding <br />that there was a Technical Revision some yews back to change the numbering on the original <br />1983 Reclamation Plan. <br />2. Hall Irwin commits to having a representative from Sinclair Pipeline Company present on <br />site during the spillway construction. <br />The 1998 flood inundated most ofthe three ponds on the north side of the river, however the <br />only evidence of significant damage occurred where flow was concentrated between ponds 5 <br />and 4. This damage will he mitigated and controlled in the future by the construction of a <br />spillway. All other Locations where water rnters and exits the ponds seem to be able to <br />withstand the erosional forces of the river and it is not thought that additional spillways are <br />necessary. <br />Please feel free to call i f you have any questions or additional comments. Thanks. ~ (~~' Z ~~ ~ <br />Sincerely, <br />TUTTLE APPLEGATE, INC. <br />T R ~~. <br />Dana Moore, bIT <br />CC: Jeff Gregg, Hall Irwin Construction Company <br />TA File # 99-203 <br />1990 Grant St. • Suite 304 • Denver, CO 80233 5441 Boeing Drive. • Suite 200 • Loveland, CU 80536-8855 <br />703) 452-6611 • Fax (303) 452-2759 (970) 461-9884 • Fax {970) tit 3-1177 <br />
The URL can be used to link to this page
Your browser does not support the video tag.