My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV14169
DRMS
>
Back File Migration
>
Revision
>
REV14169
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:25:20 AM
Creation date
11/21/2007 10:49:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977301
IBM Index Class Name
Revision
Doc Date
3/30/1998
Doc Name
TR ROBERTS QUARRY PN 77-301
From
COLORADO LIEN CO
To
DMG
Type & Sequence
TR2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />MINING PLAN <br />Phase 1 Area 8 and 9 will be stripped and Areas 8 9 and Dart of 10 will be mined <br />(mostly that Hart of Area 10 which was already stripped prior to 19''~;~~L <br />°-'' ^ '••~" L~ "-~---a. The topsoil from [he lower area will be remcved first and <br />stockpiled in Area A (Marked TS o^ some ma ~s .The topsoil will b~° preserved <br />and vegetated with Annual rye and Indian ricegrass. The sandstone over- burden <br />will be drilled and shot. I[ will [hen be stripped and piled in front of Area A. <br />".: __ r .. :11 L_ ~ ,.J _r ._._..:1 .. L:,.L .. :11 L.. ,...,_1, ..: I,.,! :~ A _.... AA ~rz--r ma8ien <br />. Limestone will be removed from area 1 <br />and W 1/4 of area 10. This phase i~was expected to require 2 years_but has <br />lasted from ]977 to 1998 and is now expected to last for another yea.r. The total <br />area worked will be approximately 33 26 acres. <br />Phase II Areas 7 and 6 will be stripped and mined."-°°', A °--' ~••~" L_ "•,{.tThe <br />topsoil will be removed, stockpiled, preserved and vegetated in area A. The <br />sandstone will be stripped and piled in Cron[ of A. ' ~-vrne~e~"e-se-m+"'~'11~~2e.o^+Fc <br />.This phase will require <br />approximately 23 years. The area worked a[ this time will be approximately 42;?3 <br />acres. <br />Phase III Areas 5 and 4 will be stripped and mined. ^-°° ` °-a ` •°~" `-° -•-~-pe~The <br />topsoil will be removed, stockpiled, preserved and vegetated in area A. The <br />sandstone will be stripped and piled in front of A. <br />c___ __ ~ ~ A . - l .L_ c , 17 ,.r .L.. ,l, , 1~ _c ._ ,n This phase is expected [o <br />require approximately 23 years. The area worked at thisfk+-a time will be <br />approximately 2833 acres. Area 9 will be reclaimed. The sandstone overburden <br />will be backfilled into [he excavation left by extraction of [he limestone, leveled <br />and contoured. The topsoil from area A will be spread over the sand:;tone at a <br />EXHIBIT D. (REV) M[NE PLAN. ROBERTS OUARRY MAR 1998, PAGE 2 OF 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.