My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV14160
DRMS
>
Back File Migration
>
Revision
>
REV14160
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:25:20 AM
Creation date
11/21/2007 10:49:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Revision
Doc Date
6/2/2004
Doc Name
Review Letter & Cost Estimate
From
DMG
To
J.E. Stover & Associates
Type & Sequence
TR44
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br /> BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task p 175 State Cnforado r'ennmjobM C-81-038 <br />Data OS/24?004 County Derry Abbreviation note <br />User JRS SAe Bowie No. r Mrno Ftlename : C038.175 <br />Agency or organization name Colorado Drvis,on 01 Mineral, And Geornuy <br />Permit Or other lob aehon Tochnieal Revision 44 <br />Task description Replace Topsoil /rom Stockpile to Light-Use Roads <br /> <br />HOURLY EQUIPMENT COST <br /> Basic machine Cut D9R - 9SU Horsepower 405 <br /> Blade type -Semi-Universe! <br /> Attachment no 1 ROPS CaD Shift basis 1 par day <br /> Attachment no 2 3-Shenk upper <br /> Data source (CRG) <br /> Utilization qo <br />Cost Breakdavn Ownership cost/hour : $51.07 NA <br /> Operating wstlhour $93.97 100 <br /> Ripper op. cosUhour $0.00 0 <br /> Operator cosMour $3183 NA <br /> Total urnt wsVhour $176.87 Total east cosUhour $176.87 <br /> <br />MATERIAL QUANTITIES <br />Imbaj Swell Loose <br />volume 1,900 BCY factor 1250 volume: 2,375 LCY <br />Source of estlmatad volume Division Estimate <br />Source of estimated swell factor .CAT Handbook <br /> <br />HOURLY PRODUCTION Job Condition Correction FaUgrs Source <br /> Operator skill 0 75 (evg ) <br />Average push distance 200 feet Material rbnsstenq 100 (Cat HB) <br />Unadiusted trourly production 700.0 LCYlhr Dozing method t 00 (qen ) <br /> VrsiDdity 100 (avg.) <br />Material consistency description Job efficiency 0.83 (1slritt/day) <br />Consobdatud stockpile Spad pile 0.80 (1nr1•r1) <br /> Push gradient 0.90 (Cat HB) <br />Average push gradient 5.00 96 (pas) Altitude 1.00 (Cat HB) <br />Average site altitude 7,500 feet Materiel weight 0 90 (Cat HB) <br /> Blade type 1.00 (S/SU/U) <br />Material weight : <br />Weght desor <br />tion 2.550 Ibslt.CY Net correction O.d t <br />p <br />Earth - Dry perked Adjusted unit producion 284 00 LCYfhr <br /> Adjusted Heel production 284.00 LCYfhr <br />JOB TIME AND COST <br />Fleet sze 1 Dozers) Total job umc 8.36 Hours <br />Unrt cost $0.623 /LCY Total iob wst $1,479 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.