My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV14160
DRMS
>
Back File Migration
>
Revision
>
REV14160
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:25:20 AM
Creation date
11/21/2007 10:49:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Revision
Doc Date
6/2/2004
Doc Name
Review Letter & Cost Estimate
From
DMG
To
J.E. Stover & Associates
Type & Sequence
TR44
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimation Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task p : 173 State Colorado PenniVlobiy C-81.038 <br />Data : OS/24r2004 County Dolla Abbreviation none <br />User : JRS Site Bowie No 1 Mme Filename C038-173 <br />Agency w organization name Coloraun Drvr~nn t ~l Mrnnrars Arr,! GEhlogY <br />Permit or other lob action Te~!rrnc-,-d Rn~~suvr JJ <br />Task oesuipuon Regrade Light-Use Roads <br /> <br /> <br />HOURLY EQUIPMENT COST <br /> Basic machine : Ca! 09R - 9SU Horsepower a05 <br /> Blade type Semi-Universal <br /> Attachment no. 1 : RODS Cab Shift bears - i per day <br /> Attochment no, 2 : 3-shank ripper <br /> Date source (CRGI <br /> UtuizaUOn °r, <br />Coal Breakdown Ownership cosUhour $51 07 NA <br /> Operating cosUhour 593.97 100 <br /> Ripper op cosUhour $0.00 0 <br /> Operator cosUhour 331 83 _ NA <br /> Total unit cosUhour 3176.87 Total Oeet cosVhour $176.87 <br />MATERIAL QUANTITIES <br />Initial <br />volume 3,800 BCY <br />Source of estimated voume <br />Average push distance : 200 feet <br />Unadjusted hourly production 700.0 LCY/hr <br />Malenal consistency description . <br />Compacted fill or embanknroM <br />Swett Loose <br />factor 1.330 votumo 5,054 LCY <br />n Esbmare <br />sndbook <br />Job CondiUOn Correction Fadors Source <br /> Operator skill 0 75 (avg ) <br /> Matenal consistency 0-90 (Cat HB, <br /> Dozing method i.00 (gen ) <br /> Visibdrty 1.00 (a vg ) <br /> Job eMdency 0 83 (ishrlVda <br /> Spoil pile 0, 80 (toil-rQ <br />Average push gradient : 5.00 % (pos) Altitude L00 (Cat <br />Average site altitude : 7.500 tees Material weight 0.79 (Cat <br /> Blade typo _ 1.00 (S/Sl <br />Material weight 2.900 IbslLCY Net correction 0.32 <br />Weight descnptbn <br />Deroniposed rock - 50`v~ Ra:k. 50°6 Earth Adjusted unit production 22J 75 LCYttir <br /> Adjusted fleet production 224.75 LCYIhr <br />JOB 71ME AND COST <br />Fleet size 1 Dozerls) Total lob Ume 22.49 Hours <br />Unit coal SO 787 /LCY Total lob cost $3, 977 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.