Laserfiche WebLink
CONSOLIDATION COAL CD. 9 CH 94-6-A <br />through a large xaterway. Drainage in the area is not obstructed <br />{Tr. 197-98). <br />The State ciao evaluated the lead use capability of the. <br />area. Illinois' primary coaaideratioa is ramtoriag faxmnbla <br />ground. This iacludea prams farm lead sad an intezmediate <br />category referred to as high capability ground. All other soils <br />era labeled limited capability ground. The State iasurea that <br />the mine compaxyy-replaces the approximate amount of prime sad <br />high capability load that existed before mining, This avaluatioa <br />is dose on a permit wide beefs. is this case the AOC evaluation <br />could be done using the satire pit. The State inaurea that the <br />farmers do sot lone formable ground (Tr. 199-200). TDD~i <br />evaluated the isolated portion oP the permit knows ere thn Kadolph <br />property and concluded that,' oa•that acreage, prime and high <br />capability ground poet-mining exceeding the prime sad high <br />capability ground originally present on the 1Cadolph land (Tr. <br />701). <br />Prior to receiving the tea day aotiee from OSM, the State <br />hoe issued a formal decision to Lynch and provided OeM with a <br />copy. The elate was coafuaed by the ten day notice because OSM <br />did aoE e~lain vhy it was diesatiatied with the 9tate'a reaponae <br />to Lyaeh. The tea day notice reiterated Lynch'e complaints sad <br />called them violatioae. The State had already iavaatigated the <br />situation sad closed the iavestigatioa dower. It waa the witness' <br />proleamional opinion that the site had been returned to AOC (Tr. <br />201-43). <br />Oa croea examination the witaeee said that Consolidation had <br />not requested a variance from AOC due to thick overburden. The <br />amount of swell sraa not mentioned in the germit application. The <br />State did sot consider thick overburden rhea it made the <br />determination that Coaaolidatioa had met AOC on the site. Tha <br />State did write a NOV when Consolidation began building the ditch <br />before it was approved. The State ran satisfied with .the plane <br />for the ditch sad approved it with alight modification. Ditch A- <br />I was evaluated in terms 'of the xhole pit. The soil maps are <br />provided by the 8011 Coasarvatioa Sesviee and reflect a elope <br />range. it the maps showed a pre-miaiag elope range of 10 to 18 <br />parcaat the State would allow a poet-miaiag elope of ao more than <br />18 peroeat. State inspectors chock for elope problems during the <br />operation sad address them is the field as they arise {Tr. 209- <br />ls) . • <br />The Applicant called Martin William Schambnr, project <br />engineer with Coasolidation'a sagiaeerfag Servioee Group in 6t. <br />Louie. Sehamber eras formerly as aealetaat mine aagiaeer at <br />euraiaq Star Ho. 5 is Pinckasyville. 8e is e~perieaced in <br />r••-;~~ cos~utar mottwara ouch as diacaeesd by Mr. sebum sad area <br />asked to evaluate the threr optioaa auggeated in Behum'~a <br />