My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE24827
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE24827
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:33:27 PM
Creation date
11/21/2007 10:48:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
Enforcement
Doc Date
10/20/1994
Doc Name
OSM REPLY TO THE INTERVENORS BRIEFS
Violation No.
TD1994020352002TV1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CO~OI.IDAiION (.UAL CO. 5 CH 91-6-R <br />regulatory authority on matters of approximate original ooatour. <br />(Joint Exhibit 1, page 60). The wituaea stated Chat before 09M <br />may step into a situation, it must variously consider the fact <br />that the 8tat• and the operator have been involved in a long-term <br />planning prooess. In this case, OSIQ reviewed the original Permit <br />149, the history of Ditch A-l, the technical data, sad the <br />permitting process. 06M detezmiaed Ditch A-1 had not bean part <br />of the original permit sad had been started be£cre the State had <br />approved it. The Applicant received a violation from IDMM for <br />eeastructing a drainage ditch without prier approval. The <br />witaesr felt that the planning procase betwaea the State and the <br />operator had broken drnm and that the mining operation dictated <br />the reclamation (Tr. 57-65). <br />Oa cross asamiaatioa Saadburg testified that is making the <br />evaluation'that AOC had not beBa achieved by--COaaolidatioa, OSD4 <br />had looked at the western tract of the Radolph property. The <br />former drainage system was 500 feet long nod khe pseeeat one in <br />3,000 feet long. Ditch A-1 is deeper than the former stream <br />}»cauae of tlae spoil placed oa the western pert of the affected <br />area. The witnaas assumed that part o! the additional material.. <br />oa the Hadolph property was swell (Tr. 66-73, 77-78). <br />The Appiieaat did not violate its ditch design or diversion <br />requirements, but n normal replacement.ditch would carry the <br />maximum velooity, which is this case was 1.6 feet of avatar. The <br />ditch would Lit well with whatever was present before mining <br />(Tr. 81-8Z). <br />Oii re-aroaa the witness stated that, is its initial permit, <br />Consolidation mentioned awali but net thick overburflen. Aerial <br />photographs o! the site show that gpo1l was elevating as the <br />operation Dame want (Tr. 83-88), .. <br />Paul Thomas Behum, physical scientist with OSM'e Saatern <br />Ssrvic• Canter, testified for the 8eapondeat. Ia March of 1993. <br />8aham was asked to perform commuter modeling of the 7Cadolph area. <br />The witness took data of pre- nod post-mine elevations and <br />applied the 3:atsractive Surface DQodeliag Program to~them to <br />calculate a grid of the eurfnce. 'H'rom those grids the witness <br />created a pee- sad poet-mialaQ topography map. Ia April, the <br />witaass ran additional ornas-seatiosss. Se aacompaaiad the 09M <br />inspector oa the 8eptamber tour of the site and assisted in <br />mswsuriag elope angles around Ditch A-i. 8e later produced s <br />draft report that detailed nod compared slopes from pre- to poet- <br />miaisg (Tr. 90-97). <br />Seh~a idaaatifind several exhibits which rapreseat hie <br />resaarah. (&. Sxhi.bit Z, figures 1-9). 8a testified that the <br />Ditch ~-i is approximately 15D0 feet wide sad •wrial thausaad <br />feet long. The elevations in that area reanh 480 feet, which is <br />
The URL can be used to link to this page
Your browser does not support the video tag.