My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE24817
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE24817
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:33:27 PM
Creation date
11/21/2007 10:48:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
Enforcement
Doc Date
3/25/1982
Doc Name
NOV
Violation No.
CV1982016
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />i. <br />~J <br />(j~HC iULE in `;~TICc JF '•J I;LarIC':) <br />NoriCe of violation vo. HO`J'- 82-16 <br />-------------------------- <br />'IaTUPE ^F VIOLaTIO>I <br />The permittee has constructed a haul road at the northern end of the permit area <br />------------------------------------------------------------------------- <br />connectiny the Canadian Strip and Marr operations. This facility is not addressed <br />------------------------------------------------------------------------- <br />nor approved in the permit. The permittee did not inform the Division of the <br />-------------------------------------------------------------------- ---- <br />buildin~ of this_ facilityi nor seek a permit revision to address this faciliteL_____ <br />dCi OR PERMIT PR Q'J ISIO~':(S) V[JL47ED <br />aCT $ECiI~':(S)_39_33_110(2)(n)_ 39_33_IlI(1)(a1 <br />------------------------------ <br />PERr~IT ScCTi7•`J(S)_816 150-816_175, Flap 28a Map I <br />Regulations Section(s) 2.05.3(3), 2.05.3(3)(c) <br />~ORTIO'! CF T4ii 7PERdTION 77 'dHICH ir,IS >aCiICE aP~LIES <br />The haul road constructed at the norther portion of the permit area to access <br />---------------------------- ---- ------------------------------------ <br />Kerr Coal proper , <br />---~l~ow~, ~o2~w~1~wV~ <br />----- --'y'I~~~~------------------------------------------'-----------° <br />STEPS NECESSaRy TO d9aiE vIOLaTIO'i (PEHED[al aCitON) <br />1. A plan addressing a12 applicable performance and design criteria for the haul <br />--- -------- ----- ------- ---~--------~-----------------y-~--~---_--__ <br />road, construction methods, a plan for reclamation of the road, certlficatron that <br />the road has been constructed as desiyned, bond requirements for the road, and a <br />------------------------------------------------------------------------- <br />timetable for removal, to be submitted to and approved by the Division. <br />2. A statement of environmental impacts_(yotential-and actual) which did or may ___ <br />have resulted from the unauthorized construction. <br />TIuE FOP a9aTEMENT (~aOT MORE TtidN 90 DdvS): <br />0`1 OR 3EFJRE --------------~ 19--- <br />30 days from receipt of the Notice of Violation. <br />------------------------------------------- <br />CNP./LNC7~S/°OS <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.