My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV14126
DRMS
>
Back File Migration
>
Revision
>
REV14126
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:25:18 AM
Creation date
11/21/2007 10:48:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
11/5/1998
Doc Name
TRAPPER MINE ID 05-02838 COYOTE DAM ID 1211-CO-09-02838-01 ANNUAL IMPOUNDMENT REPORT 30 CFR SECTION
From
TRAPPER MINING INC
To
US DEPT OF LABOR
Type & Sequence
SL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRAPPBB ~IpIIi6 I11C. <br />July 26,1994 <br />CERTIFIED #P240981761 <br />Wiliam Holgate <br />District Manager <br />US Department of Labor - MSHA <br />P.O. Box 25367 <br />Deaver, Ca 80215 <br />Dear Mr. Holgate: <br />Subject: Annual Imppooundment Report: Coyote Dam (I.D. No.1211-CO-09-02838-01) <br />Trapper Mine (05-02838) <br />The structural integrity of Coyote Dam has remained unchanged. All appurtenant structures <br />including trash racks, decant, valves and discharge CMP are in place and operating as designed. <br />There Gave been no modifications to the structure in the past year. <br />During the past year, the dam was virtually dry at a sediment elevation of apprrnrimately 6298.0, <br />unt7 spring runof[ began around the beginning of March, 1994. The maximum water elevation <br />reached was 63015 feet on March 10, 1994. Water elevations have steadily decreased until the <br />dam was once again virtually dry at an elevation of 6297.8 on July 26,1994. <br />The 6297.8 elevation corresponds to bazically, the same elevation (6298.0) at which the dam dried <br />out last year. A direct sediment volume survey performed in July of 1993 yielded a runoff capacity <br />to the emergency spillway of 98 acre-feet and a sediment volume of 37.9 acre-feed The July 1993 <br />to July 1994 correlations of the sediment elevations in a dry condition indicate that these numbers <br />are still representative oCthe existing capacities oC Coyote Dam. <br />LCyou have any questiotu regarding this report, please call. <br />Sincerely, <br />" ark Wehmanen <br />r. Project Engineer <br />2618 _ O PE No. 25518 <br />urwwi.~/-sxn~res <br />e PV Vtr <br />9e <br />P.0. Box 187 Craig. Colorado 81626 (303) 824-4401 <br />
The URL can be used to link to this page
Your browser does not support the video tag.