My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV14112
DRMS
>
Back File Migration
>
Revision
>
REV14112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:25:17 AM
Creation date
11/21/2007 10:48:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
5/11/1994
Doc Name
BMRI SAN LUIS PN M-88-112 PERMIT MOFICIATION WEST PIT PARTIAL BACKFILL
From
BMRI
To
DMG
Type & Sequence
TR18
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />' Battle Mountain Reaourca, Inc. <br /> <br /> <br />1 <br /> <br /> <br /> <br /> <br /> <br />1 <br />112 Permit Modification <br />As outlined in the approved permit, development of the Kfest Pit has resulted <br />in an irregular pit configuration with a series of regular benches and highwalls mixed <br />with azeas of relatively Flat, wide benches. In most cases, the bench/highwall <br />configuration has a maximum height gain of 45 ft between the wid nches. <br />The mined-out pit configuration for the West Pit is shown on Figure C-4 ' the <br />approved permit document. '~u~~~, , <br />~( ~}<.-~It~ w~axrmv.. <br />Waste rock from the West Pit is composed of gravels an bbles from the zle~~1,,,,,,s <br />Santa Fe Conglomerate, pink gneiss, and biodte or biotite-amphipole gneiss. Waste <br />rock is presently hauled from the pit to the waste rock disposal A portion of <br />the waste rock from the Deep West Pit azea will be hauled to to Rock Disposal <br />Area B for temporary storage. When mining is completed in the beep West Pit azea, <br />mining will progress through the western portion of the pit and i~lto the Pink Gneiss <br />area. Waste rock from the west end of the pit and from the Pink GGneiss azea will be <br />hauled to the Deep West Pit azea for disposal. Following the a <br />m e Ptn Gnetss area, the waste rock temporarily stored on ~ <br />Area B will be placed u backfill into the Pink Gneiss area. <br />discussed in more detail i ection D.3.4.2. <br />of the ore zone aquifer is occurring as <br />ems: Dewatenng has only been necessary m the <br />wells have been installed m the West Pit, however <br />pletion of mining <br />ate Rock Disposal <br />Pit backfilling is <br />in the approved <br />t Ptt eaazt Ptt <br />]v one of these <br />wells has~een used for dewatering purposes. Water pum~ from this well <br />' maintains the water level in the ore zone aquifer below the lev 1 of active mining <br />operations. <br />The county road has been relocated as described in the approved permit to <br />allow mining in the West Pit area. <br />' D.2.5 Pit Wall Stability <br />' The pit wall stability study described in the approvkd permit remains <br />unchanged. <br />1 <br />' ay D-2 lcet o. <br />
The URL can be used to link to this page
Your browser does not support the video tag.