Laserfiche WebLink
l • <br />Pnge ? <br />ORDER <br />Based on the above findings of fact and conclusions of law, the Board ORDERS that: <br />Fort Lyon has violated Section 34-32.5-109(1), C.R.S. <br />2. Fort Lyon shall comply with the following CORRECTNE ACTIONS: <br />A. Secure an approved Construction Material Extraction permit by March 19, 2002. <br />B. Post an interim reclamation bond in the amount of $8,400.00 by November 16, 2001. <br />3. Fort Lyon shall CEASE AND DESIST from mining operations until a reclamation permit has been <br />obtained. <br />4. Fort Lyon is hereby assessed a total CNII. PENALTY of $21,322.41. All but $322.41 of the Civil <br />Penalty shall be suspended pending compliance with the Corrective Actions set forth above. The <br />unsuspended $322.41 portion of the civil penalty shall be submitted to the Division within 30 days <br />of the date of this Order. <br />The rights and obligations of recipients of a Notice of Violation are described in the Colorado Land <br />Reclamation Act for the Extraction of Construction Materials, Sections 34-32.5-101 et sec .., Colorado Revised <br />Statutes. <br />Nothing contained herein, particularly those portions requiring certain acts to be performed within a <br />certain time, shall be construed as a permit or license to engage in any prospecting or mining operations <br />within the State of Colorado. <br />Dated thi ~ day of ©C~ , 2001 <br />COLORADO MINED LAND RECLAMATION BOARD <br />Michael B. Long, <br />Division of Minerals and Geology <br />