My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV14056
DRMS
>
Back File Migration
>
Revision
>
REV14056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:25:14 AM
Creation date
11/21/2007 10:47:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980001
IBM Index Class Name
Revision
Doc Date
10/3/2001
Doc Name
Proposed Decision Letter & Form
From
DMG
To
Pittsburg & Midway Coal Mining Co
Type & Sequence
RN4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
l~ .wco q <br />A~ ypp <br />`O <br />COLORADO DIVISION OF MINERALS AND GEOLOGY <br />1313 Sherman Sheet, Room 215, Denver, Colorado 80203, (303) 866-3567 <br />PROPOSED DECISION <br />for <br />Approval of Permit Renewal <br />The Colorado Division of Minerals and Geology, in accordance with C.R.S. 34-33-109(7), <br />proposes to Approve the renewal of a permit to conduct surface coal mining and reclamation <br />operations at the Edna Strip Mine, Permit No. C-1980-001. <br />This decision is based on a review of the complete and accurate application and the existing permit, <br />including all conditions and revisions approved up to October 3, 2001. In accordance with C.R.S. <br />34-33-109(7)(a), the Division makes the following detemunations which warrant that the permit be <br />renewed: <br />The terms and conditions of the valid, existing permit aze being satisfactorily met; <br />2. The present surface coal mining and reclamation operation is in compliance with all <br />requirements of the Colorado Surface Coal Mining Reclamation Act, C.R.S. 34-33-101 et <br />seq., and the Regulations promulgated thereunder; <br />3. The renewal requested does not substantially jeopardize the permittee's continuing <br />responsibility on existing permit areas; <br />4. The operator has provided evidence that the performance bond in effect for the operation <br />will continue in full force for the proposed period of renewal as well as any additional <br />bond required; <br />5. Any additional revised or updated information as required has been provided. <br />Based on a preponderance of the evidence, the permit issued to Pittsburg & Midway Coal Mining <br />Co. meets the requirements under the right of successive renewal. <br />The permit application will remain a binding part of the permit. Renewal of the permit will be for a <br />term of five (5) years. <br />I conclude that there is no basis for denying the renewal. <br />DIVISION OF MINERALS AND GEOLOGY <br />Director Date <br />C-RN-1 S_C1980001_TA[L20011003 35540 PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.