Laserfiche WebLink
<br />• <br /> <br />EXHIBIT S <br />PERMANENT MANMADE STRUCTURES <br />The only manmade structures with 200' of the proposed operations are two natural gas <br />pipelines and several power transmission lines as shown on Exhibit D-1. As described in <br />Section D, the pit disturbance limit will be outside of the gas line right-of-ways with no <br />potential for impact to the lines. Powerline protection is addressed by an existing <br />• agreement <br />n <br />LJ <br />Revised May 1998 <br />