Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task no.: 002 <br />Date : 10/29/2005 <br />User: ACS <br />State :Colorado PermiUjob <br />County :Adams Abbrevia <br />Site :Worthing Pit Filena <br />Agency or organization name Colorado Division Of Minerals And <br />Permit or other job action :Amendment application AM-Of <br />Task description :Plt dewatering <br />HOURLY EQUIPMENT COST <br />:M-1977-526 <br />:none <br />:M526-002 <br />~ Data <br />Description ~I Quantity Source <br />Pump :CenMfugal pump, 4.0 in. 1 (CRG) <br />Suction hose :Suction hose, 4 in. diam., 25 ft. L 3 (CRG) <br />Discharge hose :Discharge hose, 4 in. D, 25 ft. L 3 (CRG) <br />Labor:NA 0 NA <br />Cost Breakdown : Job Utilization <br />Ownership cosf/hour : $1.92 NA Job shift basis : 3 per day <br />Operating cosf/hour : $7.14 100 % Horsepower : 45 <br />Operator cosUhour : $0.00 NA Weight (UST) : 0.70 <br />TotalcosUhour: $9.06 <br />PUMPING QUANTITIES <br />Initial pond <br />volume : 535.00 acre feet <br />Total pond inflow surface <br />area : NA sq. ft. <br />Source of volume estimate :107 <br />Unit inflow rate in <br />gph/sq. h.: NA <br />5 foot water <br />Total pond inflow volume <br />per hour : 0.00 <br />Rated pump capacity : 40,000 gph/pump Total pumping cap <br />Initial unadjusted pumping <br />Inflow as % of pond volume : NA % Inflow during initial pumpir <br />Net unadjusted pumping <br />ity : 40,000 gph <br />ne : 4,358.25 hours <br />timr 0 gallons <br />ne : 4,358.25 hours <br />Pump efficiency factor <br />Total adjusted pumping time <br />0.9167 <br />4,754.28 hours <br />(55 min./hr.) <br />JOB TIME AND COST <br />Total job time : 4754.28 hours <br />Unit cost : $0.000247 per gallon Total job cbst : 543,088 <br />