My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV13926
DRMS
>
Back File Migration
>
Revision
>
REV13926
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:25:05 AM
Creation date
11/21/2007 10:46:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
Revision
Doc Date
4/29/2002
Doc Name
Application & Letter
From
Oxbow Mining Inc
To
DMG
Type & Sequence
MR62
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sanborre Creek Mine <br />April 19, 2002 <br />RECEiVE~ <br />APR 2 J 2002 <br />Mr. James Burnell <br />Colorado Division of Minerals and Geology DivisionafMineralaandGealogy <br />Office of Mined Land Reclamation <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />Re: MR- 62 -Additional Degasification Wells CBM-12 -CBM-14, <br />Permit No. C-1981-022 <br />Dear Mr. Burnell: <br />Oxbow Mining, LLC ("OMLLC") requests a minor revision to permit C-1981-022 <br />to install three additional degasification wells into the Sanborn Creek Mine. One <br />degasification well will be drilled from the existing northwestern-most well pad <br />and will be completed into the north end of longwall panel # 9, the final panel to <br />be mined in the Sanborn Creek Mine. The two other wells will be drilled from the <br />south western-most existing drill pad and will be completed into the southern <br />portions of longwall panel #8 and panel #9. The wells will be cased and <br />completed in the same manner as the current wells. No new access or pad <br />construction will be needed for drilling. <br />For reclamation these wells would be sealed and plugged in the same manner as <br />CBM-1 through CBM-11. Using the same estimate for these wells as was <br />included in Task 064 of OMLLC's current reclamation bond estimate, the direct <br />cost estimate for sealing and plugging CBM-12 -CBM-14 is $16,110.87. <br />As OMLLC plans to begin drilling the first of these final three wells by the first <br />week in May, your swift consideration and approval of this request would be <br />appreciated. Please call me at (970) 929-5834 should you have questions or <br />require further information. <br />Kathleen G. Welt, <br />Environmental Supervisor <br />cc: Jim Cooper, OMLLC <br />Bill Pecharich, OMLLC <br />P. O. B o x 5 3 5 3 7 3 7 Highway 1 3 3 Somerset , C o l o r a d o 8 1 4 3 4 U S A <br />TEL (970) 929-5122 FAX (970) 929-5177 <br />
The URL can be used to link to this page
Your browser does not support the video tag.