Laserfiche WebLink
Tony Waldron -2- August 26, 1994 <br />------------------------------------------------------------------ <br />Paae/Mao Description of Chanoe <br />Exhibit 22 <br />Table of contents <br />Subsidence monitoring schedule <br />Subsidence monitoring narrative <br />July 1994 monitoring results <br />New Map 22-1 Subsidence Monuments & Influence Areas <br />Delete Map 22-6 Hydrology/Geology <br />This technical revision application will not have any effect on the <br />slope stability monitoring currently being performed at the Bear <br />No. 3 Mine. Stipulation No. 21 states that Bear Coal Company shall <br />monitor both the operational and reclaimed configurations of the <br />portal access road and portal facilities of the No. 3 Mine. <br />Monitoring shall continue on a semi-annual basis until two years <br />following completion of the reclamation of the portal access road <br />and portal facility area. Results of the monitoring shall be <br />submitted to the Division within 30 days following completion of <br />each monitoring episode. <br />Please call if you have any questions. <br />Sincerely, <br />u•.~r~-- <br />Jim Stover, P.E. <br />Consulting Engineer <br />Enclosures <br />cc: W. A. Bear, Jr. <br />