Laserfiche WebLink
-~ - ~~ ~ III Illlllllllllllll <br />MINED LAND RECLAMATION DIVISION <br />STATE OF COLORADO, DEPARTMENT OF NATURAL RESOURCES <br />NOTICE OF VIOLATION NOV No. C- 9 a - O0.$ <br />Permit No.: C-$ I- ~ I a <br />Type of Mine: C~G~[PRI4ATE <br />Operator (If Other than Permittee): <br />Sn/nE <br />Mail Address: <br />Mine: NEW ELk MINF_ <br />County: LAS ANIroAS <br />Permittee: bvve/11~NG DUEL CO_ <br />Mail Address: /OaSb (~I/6AwwV I ~ <br />WES'taN co. 8109/ <br />Date/Time of Inspection: <br />Inspector: ~ose Pfl T Dyvas fJ MAReN a5 . /99~ SAM. <br /> <br />PeralAn Serve Served By: <br /> ~ <br />Signat re of person served T~ gna ure authorized representative <br /> r., Mined L nd Reclamation Division) <br /> <br />ease ri names an~~i Date and Time of Service: <br /> M <br />CERTIFIED MAIL N0. /~IARG}1 AL ~ / l Yot D: IS P.M. <br />Return Receipt Requeste <br />The Mined Land Reclamation Division ("the Division") has conducted an inspection of <br />the above mine and has made the findings stated in the attached schedule and has <br />found violations of the Colorado Surface Coal Mining Reclamation Act, or violations <br />of required permit conditions, listed in the attached schedule. This notice <br />constitutes a separate notice of violation for each violation listed. <br />You must abate each of these violations within the designated abatement time. <br />Where the remedial action requires submission of plans, the plans are to be <br />submitted to the Division within the designated time. You are responsible for <br />doing all work in a safe manner in compliance with all applicable laws and <br />regulations. <br />The undersigned finds that cessation of mining is is not )( expressly, or in <br />practical effect, required by this notice. For this purpose, 'mi ing" means <br />extracting coal from the earth or from a waste pile and transporting it within or <br />from the mine site. <br />I <br />C.R.S. 1973, 34-33-123(8) provides for imposition of civil penalties of up to <br />b5, 000 for each violation and provides that each day of continuing violation may be <br />deemed a separate violation. <br />Important: Please read the reverse side of this page. <br />