My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV13803
DRMS
>
Back File Migration
>
Revision
>
REV13803
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:24:57 AM
Creation date
11/21/2007 10:45:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983141
IBM Index Class Name
Revision
Doc Date
10/8/1992
Doc Name
FAX COVER
From
DMG
To
COM INC
Type & Sequence
TR3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />u <br />STATE OF COLOlZ~DO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of ~Jatural Resources <br />131 }Sherman SI., Room 215 <br />Denver, CO 80:03 <br />Phone: (3031866-7567 <br />FA%: 13071 83:8106 <br />October 7, 1992 <br />Gwen Fraser <br />COM, Inc. <br />P.O. Box 80905 <br />Seattle, Washington 98108 <br />RE: Cash Mine and Mill, Permit No. M-83-141, Revision No. TR-03 - <br />Third Adequacy Response <br />Dear Ms. Fraser: <br />OF'~~(O <br />ti~ <br />ne *OV <br />,~~~. <br />t <br />~ tB l6 <br />Roy Romer <br />Governor <br />ntichael B. long <br />Division Director <br />On September 28, 1992 the Division received your response to the Division's second adequacy review of <br />technical revision No. TR-03 to Permit No. M-83-141. The Division denies the portion of the technical <br />revision that deals with the raw ore storage facility and drainage control. You must submit acceptable <br />designs and maps and obtain approval prior to use of the raw ore storage facility. The Division approves <br />the remainder of the technical revision on{y if COM, Inc. and its affiliates and Mi Vida Enterprises, Inc. <br />agree to the following stipulations: <br />The ores to be brought to the mill from off site must be characterized according to present permit <br />parameters and in addition include a detailed characterization of the tailings material (composition, <br />total volume, toxicity, acid generating potential) that will be deposited in the tailings <br />impoundment. The Division will have 10 working days to review this information. No ore material <br />maY be placed on site until the Division approves the processing of the ore in the mill. If the <br />operator does not receive an answer within 10 working days. The processing of the ores is <br />automatically approved. <br />2. All ore must originate from sites that have a valid Mined Land Reclamation permit in the name of <br />COM, Inc. and/or its affiliates and/or Mi Vida Enterprises, Inc. Affiliates must be specified and <br />approved by the pivision prior to submitting ore characterizations from those affiliate properties to <br />the Division. Milling of any ores from sites not permitted by COM, Inc. and its affiliates and/or Mi <br />Vida Enterprises will be considered custom milling and a Certificate of Designation from the <br />Colorado Department of Health will be required. <br />If you should have any questions regarding this approval with stipulations, please contact me. <br />Sincerely, <br />{ <br />William York-Feirn~ <br />Reclamation Specialist <br />WCYlyjb <br />cc: Rob Helmick, Boulder County <br />Evan Freirich m:\oss\yjb\tr03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.