My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE24624
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE24624
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:33:20 PM
Creation date
11/21/2007 10:45:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Enforcement
Doc Date
6/7/1999
Doc Name
SETTLEMENT AGREEMENT NOV/CO CV-99-003
Violation No.
CV1999003
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iiiiiiiiiiiiiiiiiii <br />.,a .- <br />COLORADO DIVISION OF MINERALS AND GEOLOGY <br />1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866~67.EIVED <br />SETTLEMENT AGREEMENT JUN 0 71999 <br />NOV/CO NO.: CV-99-003 OivisbnofMinerals6Geology <br />MINE: Foidel Creek Mine <br />PERMIT NO.: C-82-056 <br />OPERATOR/PERMITTEE: <br />Twentymile Coal Company <br />ATTENTION: George Vajda <br />ADDRESS: 29515 Routi Cuunty Road ivo. 27 <br />Oak Creek, CO 80467 <br />DATE ISSUED: April 12, 1999 <br />TYPE OF MINE: underground/Federal <br />COUNTY: Rout[ <br />The Division of Minerals and Geology ("the Division") issued a certain Notice of Proposed Amount of Civil <br />Penalty, and the operator requested a conference thereon, as authorized by C.R.S. 1973 34-33-123(8). The <br />requested conference having been held as required by law, on May 25, 1999, the Division and the operator hereby <br />agree as follows: <br />1. The amount of the penalty shall be $1,000.00; <br />2. The penalty shall be paid to the Division by the operator not later than 30 days from the date <br />[his Agreement is signed by all parties; <br />3. Payment of such penalty by the operator shall constitute a waiver of all further rights to review <br />of such penalty or of the violation on which it is based. <br />This agreement shall not be effective unless signed by the operator within ten days after the closing date of such <br />conference, which date is set forth below opposite the signature of the Conference Officer. <br />If not signed within ten days, the Division will fix the penalty at whatever amount it deems appropriate. The <br />fixed penalty amount will likely be the original penalty assessment, based on the factors referred to in C.R.S. 1973, <br />34-33-123(8)(a). <br />OPERATOR: {~T/f.~ ~ ~n,~t CsK ~ib/„y DATE: u.tc / <br />BY --_i~*yr ~, ~~~ ~ <br />DIVISION OF MINE ANHGEOLOGY: <br />$y ~ ....,-~ ~ DATE: t~ ~~. Z~/ ~cl~l <br />~. -' ; Con rre~ace~Officer ~_ <br />By Penalty Adjustment Reviewed <br />Division Dire for IRule s.o4.3(a>(c)I <br />CRS 34-33-123(8)(c) and (d) <br />c ~vo+ <br />
The URL can be used to link to this page
Your browser does not support the video tag.