Laserfiche WebLink
SANBORN CREEK MINE <br />NOV CV-2001-007 <br />Attachment to Abatement Extension Approval <br />As permitted in Rule 5.03.2(2)(e), the Division is granting Oxbow Mining Inc.'s request to <br />extend the abatement due dates for abatement steps nos. I and 3 for NOV CV-2001-007 past the <br />90 day limitation. The Division's justification for granting this extension is based on the <br />Division's recent field inspections of the azea and the operator's extension request letter dated <br />July ]0, 2001. The Division agrees with Oxbow Mining Inc. that wet field conditions have been, <br />and continue to be, a dete~Tent to the performance of abatement work. The wet field conditions <br />are due to wet weather and the melting snow that has been trapped inside berm material. <br />Climatic conditions are an acceptable circumstance, as outlined in Rule 5.03.2(2)(c)(iv), for an <br />extension beyond 90 days. <br />c: Uns97lsanborn~nov007ex t3a <br />