Laserfiche WebLink
<br /> <br />concrete pads as well as one building. Following is a list of the structures proposed for construction. <br />Beside each is an estimate of the cost of removing these features. These prices are based on CDOT <br />removal prices used for the past year. The concrete removal is based on $20.00 per square yard. The <br />cost for removal of the building is a lump sum cost. <br />STRUCTURE DIMENSIONS ESTIMATED REMOVAL COST <br />Concrete pad for batch plant 45' x 45' x 8" <br />(225 sq yd) $4,500.00 <br />Concrete pad for steel building 45' x 100' x 8" <br />(500 sq yd) $10,000.00 <br />Concrete pad for water tank 30' x 30' x 24" <br />(100 sq yd) $2,000.00 <br />Concrete for scale 20' x 120' x 12" <br />(266.67 sq yd) $5,330.00 <br />Concrete for silos 20' x 70' x 24" <br />(155.56 sq yd) 53,100.00 <br />Steel building 45' x 100' 510,000.00 <br /> TOTAL= $34,930.00 <br />These costs are for the actual removal and do not include the various "add ons" the Division <br />uses when calculating bonds. All of these facilities will be located in the plant site area which will be in <br />Phase 1 (new phase arrangement) on the south end of the site. Because the least amount of gravel to be <br />mined is in this area, this is the best place to locate the plant facilities. <br />Effect of Revision on Reclamation Plars: This revision has no effect on the reclamation plan other <br />than the need to remove these structures. The final topography and final land use is not altered by this <br />revision. <br />Map Updates: No map changes are necessary. <br />Technical Revision tt2 Fountain Colony Pit M-87-171 Page 2 of 2 <br />