Laserfiche WebLink
:~ ~ <br />Review and Approval Page 2 <br />Minor Revision 07 <br />3. Thank you for the clarification regarding reclamation of sub- <br />area ~7. <br />4. The new drawing, 2.05.3(4)-2(b), of a plan view of the sediment <br />pond is acceptable and will be incorporated into the permit. <br />However, the Division also requested a cross-section of this pond <br />as well. Please review the Division's letter of June 2, 1993, for <br />more information regarding what the cross-section shall entail. <br />Because of time constraints set by the permit renewal, the <br />submittal of this cross-section will be stipulated. <br />5. As Delta-Montrose Electric Association (DMEA) owns the power <br />line, as discussed in the permit on pages 92-93, it appears that <br />Minrec does not need to remove this line. However, please notify <br />the Division of DMEA's plan for the transmission line. <br />6. Page 130, which provides more detail regarding how the major <br />drainage channel will be reconstructed, is acceptable and will be <br />incorporated into the permit. <br />Page 100, which states that the temporary terrace ditches would no <br />longer be maintained, is acceptable and will be incorporated into <br />the permit. <br />The Division proposes to approve with conditions this minor <br />revision which addresses issues raised during the permit renewal <br />review. For the stipulations incorporated into the permit, please <br />see the second page of the decision form. <br />Please call if you have any questions. <br />Sin/cerely, <br />Christine E. J n ton <br />Reclamation Specialist <br />Enclosures ILL/// <br />034.DEC <br />