My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE24589
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE24589
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:33:19 PM
Creation date
11/21/2007 10:45:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
Enforcement
Doc Date
1/22/2002
Doc Name
SETTLEMENT AGREEMENT NOV CO-2001-014
Violation No.
CO2001014
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o~ ~~~ Ill 111111111111!!Il <br />a COLORADO DIVISION OF MINERALS AND GEOLOGY <br />'H" ~ ]3] 3 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866-3567 <br />SETTLEMENT AGREEMENT <br />NOV/CO NO.: CO-2001-014 <br />RECEIVED <br />MINE: Lorencito Canyon Mine DATE ISSUED: October 26, 2001 <br />PERMIT NO.: C-1996-084 JAN 2 2 2002 TypE OF MINE: Sltrface/Non-Federal <br />OPERATOR/PERMTITEE: Division of Minerals b GeoI~UNTY: Las Antmas <br />Lorencito Coal Company, LLC <br />ATTENTION: Bruce Addington <br />ADDRESS: 20500 Highway 12 <br />Weston, CO 81091 <br />The Division of Minerals and Geology ("the Division") issued a certain Notice of Proposed Amount of Civi[ <br />Penalty, and the operator requested a conference thereon, as authorized by C.R.S. 1973 34-33-123(8). The <br />requested conference having been held as required by law, on January 7, 2002, the Division and the operator <br />hereby agree as follows: <br />1. The amount of the penalty shall be $750.00; <br />2. The penalty shall be paid to the Division by the operator not later than 30 days from <br />the date this Agreement is signed by all parties; <br />3. Payment of such penalty by the operator shall constitute a waiver of all further rights <br />to review of such penalty or of the violation on which it is based. <br />This agreement shall not be effective unless signed by the operator within teo days after the closing date of such <br />conference, which date is set forth below opposite the signature of the Conference Officer. <br />If not signed within ten days, the Division will fix the penalty at whatever amount it deetns appropriate. The <br />fixed penalty amount will likely be the original penalty assessment, based on the factors referred to in C.R.S. 1973, <br />34-33-123(8)(a). <br />OPERATOR: ~~ C K ~° ~ I C~ ~ ~-a n ~ <br />By ~ C .t <br />DATE: I I ~ z/LO ~ <br />DNISION OF MINERALS AND GEOLOGY: <br />B ' G~ <br />nference Of. tcer <br />By <br />Division Director <br />DA COOL <br />Penalty Adjustment Reviewed <br />[Rule 5.04.3(4)(c)] <br />CRS 34-33-123(8)(c) and (d) <br />C`NV-0iA <br />
The URL can be used to link to this page
Your browser does not support the video tag.