Laserfiche WebLink
~` <br />SERIOUSNESS (To be completed by the staff) <br />Administrative, describe - failure to follow the permit requirements outlined in the March 17, <br />1996 plan for spray evaporation. <br />Onsite damage, describe - <br />Offsite damage, describe - <br />Health or safety hazard, describe - <br />STATUTE(S) VIOLATED AND DESCRIPTION iFo be completed by staff) <br />The Colorado Mined Land Reclamation Act, C.R.S. 3432-101 et sea. and specifically C.R.S. 3432- <br />103(13) and 3432-116(1) for failure to perform such reclamation as is prescribed by the reclamation <br />plan. <br />HISTORY OF VIOLATIONS (To be completed by the staftl <br />1. Operator: <br />a. Any outstanding corrective actions or unpaid civil penalties? No <br />b. History of any and all past violations and timeliness of corrective actions. <br />MV 95078 2-21-96 Failure to complete repairs to tailing pond liner by Board <br /> ordered date of 11-20-95. <br />MV 95054 6-7-45 failure to obtain a permit for milling by deadline <br />MV 95053 6-7-95 Failure to pay civil penalty by deadline <br />MV 95001 12-2-94 Violation of NOV M94042 <br />MV 94042 8-17-94 Loss of containment of tailings <br />MV 93074 9-7-93 Failure to pay annual fees and submit annual report <br />MV 92030 5-22-92 Failure to contain tailings in the impoundment <br />MV 92029 5-22-92 Failure to submit water utilization plan <br />MV 92028 5-22-92 Failure to repair rips in tailings pond liner <br />MV 92021 11-26-91 Processing ore in mill that is not permitted <br />STAFF RECOMMENDATIONS} (To be completed by the staffl <br />Violation(s): The Colorado Mined Land Reclamation Act, C.R.S. 3432-101 to seo• and <br />specifically C.R.S. 3432-103(13) and 34-32-116(1) for failure to perform such <br />reclamation as is prescribed by the reclamation plan. Specifically, failure to instal( <br />and operate a tailings pond evaporation system and land application system by <br />deadline dates. <br />3 <br />