My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV13655
DRMS
>
Back File Migration
>
Revision
>
REV13655
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:24:46 AM
Creation date
11/21/2007 10:44:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981013
IBM Index Class Name
Revision
Doc Name
POND 005 REPAIR PROJECT DESCRIPTION
Type & Sequence
TR25
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iii iiiiiiiiiiiii iii <br />999 <br />POND 005 REPAIR <br />PROJECT DESCRIPTION <br />The preferred sealing method for sealing Pond 005 at Golden Eagle <br />is to line the pond using a High Density Polyethylene liner of at <br />least 60 mil thickness. <br />The method of installation, generally stated, is: <br />(1) Clean the area of rocks and vegetation <br />(2) Pump out any water <br />(3) Remove any mud and replace with dry dirt <br />(4) Compact all surface area to be lined <br />(5) Dig anchor trenches <br />(6) Install and test liner <br />(7) Backfill anchor trenches <br />(8) Construct fence to keep livestock from pond <br />(9) Clean project site of all trash <br />The recommended HDPE liner is black, supplied in panels 22.5 feet <br />wide and is to be installed with seams oriented up and down <br />slopes. Seams will be tested at least once each shift during <br />installation. A copy of a specification sheet is attached. <br />Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.