Laserfiche WebLink
999 <br />COLORADO DIVISION OF MINERALS AND GEOLOGY <br />RECLAMATION COST SUMMARY FORM <br />PERMIT NUMBER: M-85-212 PREP. BY: ACS <br />DATE: 4-13-94 OPERATION: Arkine Park Quarries <br />PERMIT ACTION: Permit Amendment <br />TASK NO. <br />1 Mobilize and De-mobilize CAT D8N dozer. A 20 mile 511.09 <br /> radius was selected in order to maximize bide recd. <br /> (see attached mob-demob estimating form). No mob-demob <br /> coat was included in the bond estimate prepared by the <br /> operator. <br />2 Backfilling and grading (see attached Bulldozer Work 17 995.00 <br /> estimating form and 4/6/94 inspection report). <br />3 Ripping of compacted areas (see attached Ripping Work 792.11 <br /> estimating form). <br />4 Seed with reclamation grasses, plant trees, fertilize 21 365.93 <br /> and apply mulch. The operators cost figures are <br /> accepted with the exception of the mulch cost, which is <br /> increased to $280.00/acre for the potential use of <br /> hydro-mulch (see 4/6/94 inspection report). This <br /> yeilds a total coat of $494.01 per acre, with a total <br /> 43.25 disturbed acres. <br />6UB-TOTAL.... .. ........ ..............................540, 64.14 <br />INDIRECT COST'(@ 15.8.percent of .direct) + 6 24.93 <br />SUB-TOTAL N2 ............. .. ........ ... ...............547, 89.07 <br />. .. . ....... <br />ADDITIONAL 5~ REQUIRED BY SB-247 (passed in 1993) ............. + 2 54.45 <br />TOTAL ...........................................................549, 43.52 <br />'1'aR TOT11I. DOIID 11lIOi1gT 1lEQOIRaD (R011NDRD1 I8 SS0.000.00 <br />(The Division currently holds $34,404.55) <br />