My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE24534
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE24534
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:33:17 PM
Creation date
11/21/2007 10:44:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
Enforcement
Doc Date
7/21/1995
Doc Name
MARR STRIP MINE C-80-006
From
DMG
To
LARRY ROUTTEN-WALLY ERICKSON
Violation No.
TD1994020352002TV1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
;~: <br /> <br /> <br />STATE OF iii iiiiiiiiiiiii iii <br />999 <br />COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />DepanmeN of Natural Re sources <br />1313 Sherman 51., Room ? 15 <br /> <br />Denver, Colorado 80203 I~~ <br />Phone: 13031 866-3 567 <br />FAX 13071831-8106 <br /> DEPARTMENT OF <br />DATE: July 21, 1995 NATURAL <br /> RESOURCES <br />TO: Larry Routten Roy ROmer <br /> Wally Erickson `pVp11O1 <br /> lames 5. Eochhead <br /> <br />FROM: <br />Erica Crosby ~~ E.ecmive Dvecror <br />m¢hael 8. Long <br /> Divivon Direuor <br />RE: Marr Strip Mine (C-80-006) <br /> Reclamation Cost Estimate- Bond Reduction <br />Enclosed, please End the reclamation cost estimate for the Marr Strip Mine (C-80-006). <br />This estimate is for the remaining reclamation liability for the mine, not including the 720 <br />Pit Phase I bond release. Most changes made to the 1991 estimate were to reflect 1995 <br />costs. <br />A few tasks were added to the estimate due to recent permitting actions and/or DMG <br />changes in bonding policy. Changes are as follows: <br />Task 2a- "This task was added to move additional material from Bush Draw in the <br />North Pit. This change was approved under TR-13, but there was no estimate done <br />at that time. It appears that topsoil and seeding were already included in the <br />previous estimate, so no new tasks were created. <br />Task 16- Final grading of the reclaimed area was reduced from 186.3 acres to 66.3 <br />acres due to Phase I bond release of the 720 Pit. <br />Task 41- Floodlights, standby scraper and road maintenance was reduced 50% due <br />to work complete at the 720 pit. <br />Task 47- This task was added to construct PD-3, PD-4 and PD-5 as approved under <br />TR-13. <br />Task 48- A cost to remove ditches and rill and gully repair work were no[ included <br />in the 1991 bond estimate. A cost was included in this estimate to perform this work. <br />ter., „,.. <br />In summary, the total performance. bond amount for remaining work at the Marr Strip Mine <br />is $1,410,461.00. Remaining;(iability. for the 720 pit is $1,447,478.00 (according to WHE <br />memo dated 6/13/95). The total liability for the Marr mine is 2.857,939.00. <br />~°~t4-'~7': <br />Please let me know if you have any questions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.