Laserfiche WebLink
<br /> <br />Memo to Erica Crosby <br />Bowie No. 1, TR-28 <br />page 3 <br /> <br />operator should be required to monitor these piezometers quarterly through the <br />first two years following backfilling and annually in June thereafter for the <br />duration of the reclamation liability period. If unacceptable saturation occurs <br />within any of these fill wedges remedial measures could then be developed and <br />implemented by the operator. Finally, sufficient surety should be retained to <br />accomplish monitoring of these facilities. <br />With the imposition of the above conditions, I recommend approval of the <br />modified Bowie No. 1 Mine postmining reclaimed configuration proposed by <br />Bowie Resources Limited within its TR-28 application, as amended. <br />cc: Larry Routten <br />doc: C:\WP51\COAL\BOW1TR28.WP5 <br />JP/JP <br />