My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV13615
DRMS
>
Back File Migration
>
Revision
>
REV13615
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:24:43 AM
Creation date
11/21/2007 10:44:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Revision
Doc Date
1/7/1997
Doc Name
BOWIE MINE NO 1 APPLICABILITY OF PREVIOUS STABILITY ANALYSIS TO THE PROPOSED RECLAMATION PLAN MODIFI
From
DMG
To
ERICA CROSBY
Type & Sequence
TR28
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Memo to Erica Crosby <br />Bowie No. 1, TR-28 <br />page 3 <br /> <br />operator should be required to monitor these piezometers quarterly through the <br />first two years following backfilling and annually in June thereafter for the <br />duration of the reclamation liability period. If unacceptable saturation occurs <br />within any of these fill wedges remedial measures could then be developed and <br />implemented by the operator. Finally, sufficient surety should be retained to <br />accomplish monitoring of these facilities. <br />With the imposition of the above conditions, I recommend approval of the <br />modified Bowie No. 1 Mine postmining reclaimed configuration proposed by <br />Bowie Resources Limited within its TR-28 application, as amended. <br />cc: Larry Routten <br />doc: C:\WP51\COAL\BOW1TR28.WP5 <br />JP/JP <br />
The URL can be used to link to this page
Your browser does not support the video tag.