Laserfiche WebLink
n <br /> Issues to be addressed are: <br /> • Status regarding the Flatiron Levee Certification application; <br /> • Status reports regarding the flood hazard determinations from the resource interests; <br /> - Flatiron Company <br /> - UD&FCD <br /> - University of Colorado <br /> - FEMA <br /> • What should be the 100- year floodplain for the 1997 flood season?; <br /> • Do we want to consider making a public notice to the residents who are located in the natural <br /> South Boulder Creek Floodplain regarding the purchase of flood insurance the near future?; <br /> • Review the compatibility of the Reclamation Plan and the Flood Mitigation Plan; and <br /> • Others. <br /> The purpose of the meeting is 1) to determine the status of a number of engineering <br /> investigations which are in progress for the subject site and 2) what actions should be <br /> considered in preparation for the 1997 flood season within the South Boulder Creek Floodplain. <br /> I welcome your participation in addressing these floodplain issues. <br /> Sincerely, <br /> ar ng, Chief <br /> F1oo lain Man ement and <br /> Flood Contro Section <br /> CC. Daries "Chuck" Lile Director, CWCB <br /> (see attached list) <br /> a:cumetin9.doc <br />