My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-06-11_REVISION - M1983164
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983164
>
2007-06-11_REVISION - M1983164
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 6:06:00 PM
Creation date
11/21/2007 10:43:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983164
IBM Index Class Name
Revision
Doc Date
6/11/2007
Doc Name
Completeness Materials Submitted
From
George F. Gallegos
To
DRMS
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXIiIBTT E -RECLAMATION PLAN <br />The reclamation we propose to achieve is to replace topsoil 12-16" in a 3-5 acre site and <br />plant dry grass seed. We will be replacing the topsoil with a front end loader and smooth <br />the azea so the grass may be planted. We will be using approximately 10# of seed per <br />acre and will fertilize with cow tnanure from our own property. When we reclaim these <br />areas they will be in comparison to the vegetation in the areas adjoining the reclaimed <br />areas. The areas for reclamation at this time did not have the soil and are not suitable for <br />any other kind of vegetation except dry grass. <br />When we fmish with a 3-5 acre site, we will then proceed to replace topsoil to 12-16" <br />with a front end loader which will take approximately 3-5 days. We will then flatten the <br />land and seed, which will take approximately 1-2 days, We will fertilize the land, which <br />should take 3-5 days. <br />We will be working the permitted land from east to west and then from south to north. <br />The final grading shall be a 10 to 1 grading. The seeding used shall be dry grass seed at <br />approximately 10#'s of seed needed per acre. At this time there is not any vegetation, so <br />we will not reclaim any kind of vegetation. The fertilized used for reclamation will be <br />cow manure with approximately 3-5 ton per 3-5 acre site. Topsoil needed for 3-5 acre <br />site would be 10-15 ton. We estimate the topsoil depth at 12-16". <br />,~e'~ <br />`SUN ey <br />°~~s;';~, ,.~ ~ ~~d~~ <br />Miij79c,-~e /~a,~ri <br />a~as r <br />z~ <br />Wl-- 83 - i 6 q- <br />
The URL can be used to link to this page
Your browser does not support the video tag.