Laserfiche WebLink
<br /> <br /> <br />14 T_1SE_`1F _Y14La T_la[~ <br />' NOTICE N0. NOV-___ 81=19 <br />TYPE OF MINE_Underyround Coal <br />OPERATOR (IF OTHER THAN PERMITTEE) <br />Blue Ribbon Limited Partners hiP_ <br />---------------------- ------ <br />4411 40DRESS_Star Route_Box_31A____ <br />,pasnia~ ~olorado_ 81428 <br />INSPECTOR_ Jim Herron <br />--------------------- <br />~ iiiiiiiiiiiiiiiiiii <br />COUNTV__Delta <br />PERMITTEE Sunflower Energy Corp _ _ <br />MA1C 40DRES5 770 Grant St., No. 210 <br />Denver, Colorado 80203 <br />DATE/TIME OF INSPECTION_____^__ <br />4-22-81, P.M. <br />Certified Mail No. P20 1401995 <br />Tho Xined Cdntl Reclamation Division ("the divi Sion") <br />hds Conducted do inspeCt~on Of the dbOVe mint dnd hds mdde <br />the findings stated in the attached schedule and has found <br />violations of the Colorado Surface Coal Mining Reclamation <br />Oct. or violations of required parmit conditions. listed in <br />the attacned SChedUl?. This notice COnStitutes a s~eoarate <br />notice of violation for each violation listed. <br />You must abate edCh of these violations within tha_ des- <br />igndted abatement time. 'chore the rC'medidl dCtiOn requires <br />submission of plans. ine plans are to be submitted to the <br />division within the designated time. you aro responsible <br />for doing all WorK in a safe m.3nner in compliance with all <br />applicable la«5 and regulations. [f you have any questions, <br />please call the division. (303)839-3567. <br />The undersigned finds that cessation of mining is _____ <br />is not __X __ expressly. or in practical effect. required by <br />tnis notice. For this pur pose. "mining," means extracting <br />coal from the earth or from a caste Dile anq transporting it <br />••«ithin Or from tha mine Site. <br />This notice shall remain in effect until it expires as <br />provided Dy laN. or until it i5 modified. terminated or vacated <br />in Nriting Dy an duthOriZed re nresen tdti ve of the division. <br />,or by' [he Mined land Reclamation 9oard. The time for abate- <br />Tent may be extended Dy an authorized representative of the <br />division if failure to abate within the time previously fixed <br />is not due to lacx of diligence. <br />C.R.S. 1973. 34-33-L23(8) provides for imposition of <br />civil penalties of uo to b5,000 for each violation and pro- <br />vides that aach day of continuing violation may be deemed a <br />seoarate violation. <br />i0 THE OPER.1TiJR OF THE MINE BECOri DESCRIBED: <br />PERMIT N0.____ ~~-6 ___ M1NE____Blue Ribbon <br />