Laserfiche WebLink
IIT~D ~~°~~~,~ <br />IPAMGS <br />2273 River Road, P.O. Roz 3609 <br />Grand JunrLan, CO 81502 <br />(970) 243-4900 <br />FAX: (970) 243-5945 <br />~/ <br />-vi <br />~~ <br />-i~77-oaa/ <br />21830 Huy. 550 South, F.O. Roz 1909 <br />Montrose, CO 81402 <br />(970) 249.1815 <br />FAX: (970) 240.8497 <br />Apri126, 2002 <br />Colorado Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />1300 County Road 44ZN, P.O. Roz 928 <br />Norwood, CO 81423 <br />(970) 327-0586 <br />FAX: (970) 327-0113 <br />RECEIVED <br />APR 2 9 2002 '~ <br />Ms. Barb Chiappone: <br />Division of Minerals and Geology <br />United Companies is re-submitting the Succession of Operator packages for each of our <br />gravel pit operations. I believe that we have made all of the changes suggested to make <br />the company name consistent for each operation's documents and bond for each location. <br />In addition, there was a question raised about the bonds that are in place for the Norwood <br />Pit, Pit # 4 and Pit # 3. I have attached copies of Division's letters that accepted the bonds <br />that are actually in place for each of these operations. <br />I am hoping that the Succession of Operator packages that aze being submitted at this <br />time are acceptable to the Division. I am assuming that the $125.00 fee that was <br />submitted with each of the first Succession of Operator packages has been retained by the <br />Division and is in your possession. <br />Thank you for your help and patience in this matter. <br />Sincerely, <br />~-.~~ sew <br />Richazd Johnson <br />Resource Manager <br />Attachments: Succession of Operator package for 25 gravel pits. <br />Each package consists of: <br />Succession of Operator form <br />Performance Warranty <br />Change Rider for each Reclamation Bond. <br />List of Succession of Operator packages <br /> <br />Certified Mail - 7099-3400-0017-2945-5461 <br />