Knight Piesold <br />c or4su~rLrLo <br />Mr. Steve Onorofskie <br />Centex Eagle Gypsum Company LLC <br />4 <br />January 19, 2001 <br />under-drainage structures would be designed and installed. Considering the top-down <br />construction method and the final planned slope of 3H:1 V, drainage structures, if needed, <br />could be built in the toe of the slope before the facility is filled and graded to its ultimate <br />configuration. <br />January 11, 2001 Letter Gregg Squire to Steve Onorofskie <br />Item 2 of Mr. Squire's letter requested inforntation on the reclamation of the haul road [hat <br />would access the East Pit. Haul roads within the pit footprint would be consumed over the <br />course of the mine life and would be "reclaimed" as the pit is concurrently backfilled, regraded <br />and revegetated. For reclamation platu»ng, the "Ex-Pit" haul road has been divided into two <br />units: <br />• The fill between Stations 2+00 to 7+00, and <br />• The cudfill slopes from 0+00 to 2+00 and from 7+00 [0 36+00 (pit limit) <br />The fill (approximately 65,700 cubic yards) between station 2+00 and 7+00 will be regraded on <br />to the west side of the valley (north and south of the existing fill) with slopes no steeper than <br />3H:1V and revegetated. About 75 percent of this fill, or 50,000 cubic yards, will require <br />relocation. The culvert that penetrates the fill will be removed and either sold for salvage or <br />disposed of in the county landfill. It is assumed that this work will be conducted using a 300 HP <br />bulldozer or equivalent. Topsoil outside [he immediate footprint of the existing fill will be <br />salvaged and replaced atop the regraded material. The estimated cost of this effort (excluding <br />revegetation which is estimated separately) is approximately $140,500. <br />The cut/fill slopes from station 0+00 to 2+00 and from 7+00 to the final pit limit will be <br />reclaimed to almost approximate original contour. The sketches below illustrate the proposed <br />haul road cross sections during operation and post closure. <br />'(/, IROIIYAfE FlIETIXC GROUND EYIIFACE <br />'" <br />R <br />I <br />"' <br />\\\ /[OMIFiEXT FOIWOCM [U1 LLOpE <br />\ <br />\/ <br />~A <br />\ 14RVEL EYRFI[F COMI1[iLD TILL <br />\ ~~~ '~' / FI <br />ELOIE <br /> LL <br />w+y`~ ~ / <br />FF ~ <br />{ <br /> C~~j~~ <br />~Cvr.!~. <br />Proposed Haul Road Profile <br />`k" ~CDYIEFEXI LOIIIgOCX CUL ELOIF <br />~/ RENVEG FOIYOFOIND <br />FiAiEO EURIACE <br />~y~~j/ ~(~_/ .AppROFIYAlE L11LlIMO OROVMO FYRIALL <br />l/ <br />\~ ~ % ~. <br />/ //~ LOMIACTEO RILL <br />.X~~/ FILL LLOEE <br />X~\. ~y. <br />:~ _ N <br />Reclaimed Haul Road Profile <br />\\FS]\GiLLIGAN\16006\1645A\VW\61a1e Fesponsa tloc <br />