My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE24405
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE24405
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:33:13 PM
Creation date
11/21/2007 10:42:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
Enforcement
Doc Date
5/30/2002
Doc Name
Signed Settlement Agreement
From
Lorencito Coal Company
To
DMG
Violation No.
CV2002001
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~''CO~o <br />~~ .. <br />~; <br />~,; COLORADO DIVISION OF MINERALS AND GEOLOGY <br />`'e's ` 1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866-3567 <br />SETTLEMENT AGREEMENT <br />NOV/CO NO.: CV-2002-001 <br />MINE: Lorencito Canyon Mine ~~e+~r~ ED DATE ISSUED: February 13, 2002 <br />PERMIT NO.: C-1996-084 MAy 3 p 2002 TYPE OF MINE: Surface/Non-Federal <br />OPERATOR/PERMffTEE: <br />vision of Minerals and Geology COUNTY: S mmaS <br />Lorencito Coal Company, L~,C <br />ATTENTION: Bruce Addington <br />ADDRESS: 10500 Highway 12 <br />Weston, CO 81091 <br />The Division of Minerals and Geology ("the Division") issued a certain Notice of Proposed Amount of Civil <br />Penalty, and the operator requested a conference thereon, as authorized by C.R.S. 1973 34-33-123(8). The <br />requested conference having been held as required by law, on April 9, 2002, the Division and the operator hereby <br />agree as follows: <br />The amount of the penalty shall be $1,800.00; <br />2. The penalty shall be paid to the Division by the operator not later than 30 days from <br />the date this Agreement is signed by all parties; <br />3. Payment of such penalty by the operator shall constitute a waiver of all further rights <br />to review of such penalty or of the violation on which it is based. <br />This agreement shall not be effective unless signed by the operator within ten days after the closing date of such <br />conference, which date is set forth below opposite the signature of the Conference Officer. <br />If not signed within ten days, the Division will fix the penalty at whatever amount it deems appropriate. The <br />fixed penalty amount will likely be the original penalty assessment, based on the factors referred to in C.R.S. 1973, <br />34-33-123(8)(a). <br />OPERATOR: Lolzr-.t~.i;'`~ , <br />By lku NMr~AGErt <br />DNISION'-OF MIN~ERAL~S/AJND GEOLOGY: <br />By _~~~~Y- / /~~ <br />Conference Officer <br />DATE: ~ 'Z~ U <br />DATE: O ~~ <br />By <br />Division Director <br />PenalTy Adjustment Reviewed <br />[Rule 5.04.3(4)(c)] <br />CRS 34-33-123(8)(c) and (d) <br />GNV-0JA <br />
The URL can be used to link to this page
Your browser does not support the video tag.