FiECEE4'E'f3 <br />EXHIBIT Q OCT t 7 Zoo2 <br />Mining Plan Division of Minerals and Geology <br />Sand and gravel from this operation will be removed by a bulldozer and front end loader, <br />and transported by truck for use as road base material on County roads. <br />There is no water present on the property, and no water diversions will be necessary. <br />The size of the area to be worked will ultimately be approximately 20 acres total, including <br />the presently permitted 8 acres. The additional 12 acres will be excavated beginning at the <br />eastern edge of the present pit and working in an easterly direction. <br />The mining operation will be active on an intermittent basis. Once a year, either during the <br />Spring (May} or the Fali (Sept), we will crush approximately 15 ton of material. Reclamation <br />will not begin until the entire permitted area is mined, due to continued truck and equipment <br />traffic across the site. We estimate that it will take approximately twenty years to mine the <br />entire 20 acres <br />The thickness of the material to be excavated is estimated at 15 to 20 feet. There will be no <br />overburden or waste rock. All rock will be crushed, therefore no stockpiling will be required. <br />All dirt, sand and gravel will be used by the County on County roads and projects. <br />Topsoil of approximately 6" in depth will be salvaged for use in the reclamation process. <br />Until reclamation begins, the topsoil will be stockpiled in the southwest part of the previously <br />mined area (shown on Exhibit C Map). No explosives will be used in the operation. <br />