My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE24368
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE24368
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:33:12 PM
Creation date
11/21/2007 10:41:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
Enforcement
Doc Date
5/16/1984
Doc Name
NOV
Violation No.
CV1984112
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />-3- <br />4. Effect on Permit. In aodition, if it is determined that a pattern of <br />violations exists ana that the violations were caused by unwarranted failure to <br />comply, or were willful, your permit may be suspended or revoked. <br />SCHEDULE TO NOTICE OF YIULATION <br />Notice of Violation No. NOV C-84-112 <br />NATURE OF VIOLATION: <br />Failure to stabilize and protect all surface areas, including spoil piles, to <br />effectively control erosion and water pollution. Specifically, sediment eroding from <br />the temporary overburden stockpile washed over approx 1 5 acres of undisturbed land <br />resulting in contamination of undisturbed topsoil <br />ACT, REGULATION, OR PERMIT PROVISION(S) VIOLATED: <br />ACT SECTION(S) 34-33-120(2)(d), 34-33-120(2)(.i)(II), 34-33-120(2)(x) <br />REGULATION SECTION(S) 4.14.1(2)(b), 4.05.5(2)(c), 4.18(1) <br />PERMIT SECTION(S) <br />PORTION OF THE OPERATION TO WHICH THIS NOTICE APPLIES: <br />Area located between topsoil stockpile E-1 and sediment pond A and south of <br />STEPS NECESSARY TO ABATE VIOLATION (REMEDIAL ACTION): <br />A diversion ditch must be placed to carry runoff from the south side of the over- <br />burden stockpile to sediment pond A. The previously undisturbed area must have the <br />deposited toxic material removed. A plan for reclamation must be submitted <br />including sampling of the underlying topsoil in 6 inch increments to determine its <br />present suitability as a growing medium. Their results can be compared to <br />previous baseline. <br />
The URL can be used to link to this page
Your browser does not support the video tag.