Laserfiche WebLink
.. Cresson Project <br />ReGamation Cost Calculations <br />,-~. <br />r' <br />Refertilizing: Hand Broadcasting <br />Productivity: <br /> <br />1.0 acres/hr. <br />$/hr $/acre <br />Labor 1 Laborer @ 16.98 16.98 <br />Equipment 1 Pickup @ 10.78 10.78 <br />Materials 186-0 - 400#/Acre @ $380.80/ton 76.00 <br /> Total $lacre 103.76 <br /> Recaimed Acres 1,044.40 <br /> Total Cost 108,366.94 <br />Replanting Shrubs and Trees Productivity: 1.12 acres/hr. <br />50% Survival <br />Labor 1 Laborer @ 16.98 15.16 <br />Equipment 1 Pickup @ 10.78 9.63 <br />Materials Goosebury current 47.00 <br /> Rosa woodsi 44.00 <br /> Engleman spruce 23.50 <br /> Quaking aspen 23.50 <br /> 138.00 <br /> Total $/acre 162.79 <br /> Reclaimed Acres 1,044.40 <br /> Total Cost 170,013.40 <br />Reseeding: Hand Broadcasting Productivity: 1.0 acresRlr. <br />75% Survival Rate <br />Labor 1 Laborer @ 16.98 16.98 <br />Equipment 1 Pickup 10.78 10.78 <br />Materials Seed Mix 71.75 50.75 <br /> Total $/acre 78.51 <br /> Reclaimed Acres 1,044.40 <br /> Total Cost 81,995.84 <br /> TOTAL 360,376.19 <br />R.S. Means, Site Work & Landscape Cost Data, 1994, pg. 108. <br /> t <br />_ LIME APPLICATION -INTERIM CONTINGENCY - <br />Produ ctiviry: 0.75 acres/hr. <br />la6°r: 1 Equipmcat Operator ®522.51/hr 530.01/acre <br />Equipment: 1 DSN Tractor ®108.32/ly 5144.43/acre <br /> I Hopper ®28.00/hr 537.331azre <br />Materials Lime (10 tons per acre) 5814.00/acrc <br />Total: 51025.77/acrc <br />Acres: 581.30 <br />Total addirio nal amoun[ for warranty for lime application: E59fi :80.00 <br />A7-39 <br />