My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_ENFORCEMENT - M1978352 (13)
DRMS
>
Day Forward
>
Enforcement
>
Minerals
>
M1978352
>
_ENFORCEMENT - M1978352 (13)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2022 2:33:33 PM
Creation date
11/21/2007 10:41:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978352
IBM Index Class Name
Enforcement
Doc Name
APPENDIX TO MEMORANDUM BRIEF IN SUPPORT OF DEFENDANTS MOTION TO DISMISS OR IN ALTERNATIVE FOR SUMMAR
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e. re applicable, plans for topso�segregation, preserva- <br /> n , and replacement; for stabil tion, compaction, and <br /> grading of spoil ; and for revegetation. The revegetation <br /> plan shall contain a list of the preferred species of grass , <br /> legumes, forbs, shrubs or trees to be planted, the method <br /> and rates of seeding and planting, the estimated availability <br /> of viable seeds in sufficient quantities of the species <br /> proposed to be .used, and the proposed time of seeding and <br /> planting. <br /> 112(3) (c) f. A timetable shall be required to describe the reclamation <br /> operation in terms of: <br /> ( i) An estimate of the periods of time which will be <br /> required for the various stages or phases of reclama- <br /> tion. <br /> (ii ) A description of the size and location of each area <br /> to be reclaimed during each phase. <br /> Oil) An outline of the sequence in which each stage or <br /> phase of reclamation will be carried out. <br /> (Timetables need not be separate and distinct from the <br /> reclamation plan , but may be incorporated therein.) <br /> g. A description of each of the following: <br /> (i) Final grading - specify maximum anticipated slope <br /> gradient or expected ranges thereof. <br /> ( ii ) seeding - specify types, mixtures , quantities , and <br /> expected time(s) of seeding and planting. <br /> Oil) Fertilization - if applicable, specify types, mix- <br /> tures, quantities and time of application. <br /> ( iv) Revegetation - specify types of trees, shrubs, etc. , <br /> quantities , size and location. <br /> (v) Topsoiling - specify anticipated minimum depth or <br /> range of depths for those areas where topsoil will be <br /> replaced. ` <br /> 112(3) (e) (6) EXHIBIT F - Reclamation Plan Map ( �1 <br /> The map(s) of the proposed affected land , by all phases of the <br /> total scope of the mining operation, shall indicate the following: <br /> 112(3) (e) (1 ) a. The expected physical appearance of the area of the affected <br /> land , correlated to the proposed mining and reclamation <br /> timetables. The map must show proposed topography of the <br /> area with contour lines of sufficient detail to portray the <br /> direction and rate of slope of all reclaimed lands. <br /> 112(3) (e) (11) b. Portrayal of the proposed final land use for each portion <br /> of the affected lands. <br /> (7) EXHIBIT G - Water Information <br /> a. If the operation is not expected to directly affect surface <br /> or groundwater systems , a statement of that expectation <br /> shall be submitted. <br /> b. If the operation is expected to directly affect surface of <br /> ground water systems, the operator shall : <br /> F ` <br /> - 18 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.