Laserfiche WebLink
e. re applicable, plans for topso�segregation, preserva- <br /> n , and replacement; for stabil tion, compaction, and <br /> grading of spoil ; and for revegetation. The revegetation <br /> plan shall contain a list of the preferred species of grass , <br /> legumes, forbs, shrubs or trees to be planted, the method <br /> and rates of seeding and planting, the estimated availability <br /> of viable seeds in sufficient quantities of the species <br /> proposed to be .used, and the proposed time of seeding and <br /> planting. <br /> 112(3) (c) f. A timetable shall be required to describe the reclamation <br /> operation in terms of: <br /> ( i) An estimate of the periods of time which will be <br /> required for the various stages or phases of reclama- <br /> tion. <br /> (ii ) A description of the size and location of each area <br /> to be reclaimed during each phase. <br /> Oil) An outline of the sequence in which each stage or <br /> phase of reclamation will be carried out. <br /> (Timetables need not be separate and distinct from the <br /> reclamation plan , but may be incorporated therein.) <br /> g. A description of each of the following: <br /> (i) Final grading - specify maximum anticipated slope <br /> gradient or expected ranges thereof. <br /> ( ii ) seeding - specify types, mixtures , quantities , and <br /> expected time(s) of seeding and planting. <br /> Oil) Fertilization - if applicable, specify types, mix- <br /> tures, quantities and time of application. <br /> ( iv) Revegetation - specify types of trees, shrubs, etc. , <br /> quantities , size and location. <br /> (v) Topsoiling - specify anticipated minimum depth or <br /> range of depths for those areas where topsoil will be <br /> replaced. ` <br /> 112(3) (e) (6) EXHIBIT F - Reclamation Plan Map ( �1 <br /> The map(s) of the proposed affected land , by all phases of the <br /> total scope of the mining operation, shall indicate the following: <br /> 112(3) (e) (1 ) a. The expected physical appearance of the area of the affected <br /> land , correlated to the proposed mining and reclamation <br /> timetables. The map must show proposed topography of the <br /> area with contour lines of sufficient detail to portray the <br /> direction and rate of slope of all reclaimed lands. <br /> 112(3) (e) (11) b. Portrayal of the proposed final land use for each portion <br /> of the affected lands. <br /> (7) EXHIBIT G - Water Information <br /> a. If the operation is not expected to directly affect surface <br /> or groundwater systems , a statement of that expectation <br /> shall be submitted. <br /> b. If the operation is expected to directly affect surface of <br /> ground water systems, the operator shall : <br /> F ` <br /> - 18 - <br />